FIR13-00011
| INSP-Sprinkler Rough-in/Hydro | 4/24/2013 | 4/25/2013 | 5/2/2013 4:49:27 PM | P | PART |
|
|
Overhead hydrostatic test at floors 11 -15 completed acceptable.
|
FIR12-00500
| INSP-Sprinkler Rough-in | 4/25/2013 | 4/25/2013 | 4/26/2013 4:16:33 PM | A | PART |
|
|
Rough-in passed
|
FIR12-00649
| INSP-Final Inspection | 4/25/2013 | 4/25/2013 | 4/26/2013 4:15:51 PM | A | PASS |
|
|
|
FIR13-00097
| INSP-Final Inspection | 4/25/2013 | 4/25/2013 | 4/26/2013 4:15:21 PM | A | PASS |
|
|
|
BLD12-02860
| FIRE-Final Inspection | 4/25/2013 | 4/25/2013 | 4/26/2013 7:10:01 AM | P | PASS |
|
|
Life safety passed.
|
BLD13-00535
| FIRE-Final Inspection | 4/25/2013 | 4/25/2013 | 4/26/2013 7:08:42 AM | P | PASS |
|
|
Noted correction items finished. Life safety passed.
|