ESC13-00544
| General Inspection | 4/25/2014 | 4/25/2014 | 4/25/2014 4:21:55 PM | | FAIL |
|
|
Need to stabilize loose dirt patch that is causing sediment to run into parking lot. Also need to sweep parking spots directly in front of tower. Will contact RP Monday
|
ESC14-00135
| Tracking Control | 4/25/2014 | 4/25/2014 | 4/25/2014 2:58:33 PM | P | PASS |
|
|
Corrections from Wednesday's CN have been complete. Culdesac has been cleaned and guttter in front of drop inlet at Birdsong/Windsong has been cleaned.
|
ESC13-01136
| General Inspection | 4/25/2014 | 4/25/2014 | 4/25/2014 2:52:24 PM | | PASS |
|
|
Finaled.
|
ESC13-01136
| DOC - Permit Finaled | 4/25/2014 | 4/25/2014 | 4/25/2014 2:52:02 PM | P | PASS |
|
|
Water resevoir project complete. Disturbed hillside space to the east of tank access drive is now vegetated. No other ESC issues observed.
|
ESC14-00232
| Site Preparation | 4/24/2014 | 4/25/2014 | 4/25/2014 2:48:23 PM | P | PASS |
|
|
Permit posted. Mill District Square BMPs installed and currently in good condition.
|
ESC14-00109
| General Inspection | 4/25/2014 | 4/25/2014 | 4/25/2014 2:44:45 PM | | PASS |
|
|
The area of disturbance is not stablized but not observing any sediment runoff from the site. The subdivision plans are under review so will most likely be ready to grade and grub.
|
ESC14-00214
| Site Preparation | 4/24/2014 | 4/25/2014 | 4/25/2014 2:33:51 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Joshua Edwards
RP on site making corrections. Permit is posted. RH #5 looks pretty good overall.
|
ESC14-00244
| Site Preparation | 4/24/2014 | 4/25/2014 | 4/25/2014 2:33:05 PM | P | NR |
|
|
Phone #: ###-#### >> Inspection requested via web by Joshua Edwards
This inspection was ordered but is not yet ready to begin.
|
ESC13-00755
| Tracking Control | 4/25/2014 | 4/25/2014 | 4/25/2014 2:10:54 PM | P | PART |
|
|
Streets on both ends have been swept clean. The new construction entrances aren't replenished yet but were staked off to show where rock must be extended to. Big improvement over last few days.
|
ESC13-00974
| General Inspection | 4/25/2014 | 4/25/2014 | 4/25/2014 1:57:50 PM | | PASS |
|
|
|
ESC13-01002
| General Inspection | 4/25/2014 | 4/25/2014 | 4/25/2014 1:56:23 PM | | PASS |
|
|
|
ESC14-00144
| General Inspection | 4/25/2014 | 4/25/2014 | 4/25/2014 1:51:21 PM | | PEND |
|
|
No new violations. Still need to confirm status of stockpile from intial hill cutting. It has been inactive for some time and not stabilized.
|
ESC13-00881
| Aging Inspection | 4/25/2014 | 4/25/2014 | 4/25/2014 9:41:54 AM | | PASS |
|
|
Finaled.
|
ESC13-00881
| DOC - Permit Finaled | 4/25/2014 | 4/25/2014 | 4/25/2014 9:41:37 AM | P | PASS |
|
|
Sidewalk ramp installed and ESC conditions satisfied.
|
ESC14-00323
| Site Preparation | 4/24/2014 | 4/25/2014 | 4/25/2014 8:51:52 AM | A | PASS |
|
|
Curtis-call 1/2 hr prior to getting there Phone #: ###-####
Addition at rear of house. No stormwater DI's nearby on Crescent, driveway is paved for contractor parking. Will use container for cement washout. Homeowners will be home through project, which will help keep project clean.
|
ESC14-00031
| General Inspection | 4/25/2014 | 4/25/2014 | 4/25/2014 8:41:07 AM | | PASS |
|
|
No current issue with Parks and Rec projects covered under the annual permit at this time.
|