Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00544 General Inspection4/25/20144/25/20144/25/2014 4:21:55 PM FAIL
Need to stabilize loose dirt patch that is causing sediment to run into parking lot. Also need to sweep parking spots directly in front of tower. Will contact RP Monday
ESC14-00135 Tracking Control4/25/20144/25/20144/25/2014 2:58:33 PMPPASS
Corrections from Wednesday's CN have been complete. Culdesac has been cleaned and guttter in front of drop inlet at Birdsong/Windsong has been cleaned.
ESC13-01136 General Inspection4/25/20144/25/20144/25/2014 2:52:24 PM PASS
Finaled.
ESC13-01136 DOC - Permit Finaled4/25/20144/25/20144/25/2014 2:52:02 PMPPASS
Water resevoir project complete. Disturbed hillside space to the east of tank access drive is now vegetated. No other ESC issues observed.
ESC14-00232 Site Preparation4/24/20144/25/20144/25/2014 2:48:23 PMPPASS
Permit posted. Mill District Square BMPs installed and currently in good condition.

ESC14-00109 General Inspection4/25/20144/25/20144/25/2014 2:44:45 PM PASS
The area of disturbance is not stablized but not observing any sediment runoff from the site. The subdivision plans are under review so will most likely be ready to grade and grub.
ESC14-00214 Site Preparation4/24/20144/25/20144/25/2014 2:33:51 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Joshua Edwards

RP on site making corrections. Permit is posted. RH #5 looks pretty good overall.
ESC14-00244 Site Preparation4/24/20144/25/20144/25/2014 2:33:05 PMPNR
Phone #: ###-#### >> Inspection requested via web by Joshua Edwards

This inspection was ordered but is not yet ready to begin.
ESC13-00755 Tracking Control4/25/20144/25/20144/25/2014 2:10:54 PMPPART
Streets on both ends have been swept clean. The new construction entrances aren't replenished yet but were staked off to show where rock must be extended to. Big improvement over last few days.
ESC13-00974 General Inspection4/25/20144/25/20144/25/2014 1:57:50 PM PASS
ESC13-01002 General Inspection4/25/20144/25/20144/25/2014 1:56:23 PM PASS
ESC14-00144 General Inspection4/25/20144/25/20144/25/2014 1:51:21 PM PEND
No new violations. Still need to confirm status of stockpile from intial hill cutting. It has been inactive for some time and not stabilized.
ESC13-00881 Aging Inspection4/25/20144/25/20144/25/2014 9:41:54 AM PASS
Finaled.
ESC13-00881 DOC - Permit Finaled4/25/20144/25/20144/25/2014 9:41:37 AMPPASS
Sidewalk ramp installed and ESC conditions satisfied.
ESC14-00323 Site Preparation4/24/20144/25/20144/25/2014 8:51:52 AMAPASS
Curtis-call 1/2 hr prior to getting there Phone #: ###-####

Addition at rear of house. No stormwater DI's nearby on Crescent, driveway is paved for contractor parking. Will use container for cement washout. Homeowners will be home through project, which will help keep project clean.
ESC14-00031 General Inspection4/25/20144/25/20144/25/2014 8:41:07 AM PASS
No current issue with Parks and Rec projects covered under the annual permit at this time.