Inspections for the day of: Monday, April 25, 2016.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00524 General Inspection4/25/20164/25/20164/26/2016 3:21:53 PM CANC
ESC16-00201 General Inspection4/25/20164/25/20164/25/2016 2:25:22 PMPPASS
WIP. Perimeter wattles and regular sweeping BMPs are being utilized at site. Some concrete cutting is occuring using water to control dust. No uncontained slurry discharges observed.

Permit sign posted, staging area is clean. No corrections at this time.
ESC15-01288 Tracking Control4/25/20164/25/20164/25/2016 2:07:17 PMPPEND
RP called to state that there has been some trackout to Warm Springs due to operations at RH#7.

Trackout to be cleaned and new entrance installed today PM or early tomorrow.

Will continue to montior
ESC13-01323 Site Final4/25/20164/25/20164/25/2016 2:00:25 PMPPASS
All temp BMPs now removed from Overland and Cloverdale. Two inlets on Cloverdale were missed but Tyler with Andersen stated he would be sure to remove them.

ESC permit conditions satisfied. No further inspections.
ESC14-01040 Site Final4/25/20164/25/20164/25/2016 12:29:28 PMPPASS
Construction complete and site cleaned of loose sediment and other materials. Temporary BMP DI bag installed on Shellie during construction has now been removed as requested.

ESC permit conditions satisfied.
ESC15-00514 Aging Inspection4/25/20164/25/20164/25/2016 12:14:02 PM PASS
Permit expired. BLD open for pool. No issues at site. No further ESC inspections necessary.
ESC15-00514 DOC - Permit Finaled4/25/20164/25/20164/25/2016 12:11:15 PMPPASS
ESC16-00156 General Inspection4/25/20164/25/20164/25/2016 11:55:58 AMPPASS
No activity at time of inspection for Peppermill #2. Trackout and other materials from initial phase of construction is complete. Sidewalk and gutte now complete, roads not yet paved. Permit and SwPPP on site. Silt fence and buffer area for creek/ditch is in good condtion.
ESC16-00047 Site Preparation4/25/20164/25/20164/25/2016 11:53:24 AMPPASS
Brett Phone #: ###-####

Permit sign posted. Subdivision BMPs installed and active sites are currenlty in compliance. Approved for construction. Need to designate a new lined washout area.
ESC14-01019 Aging Inspection4/25/20164/25/20164/25/2016 11:47:52 AM PASS
WIP. Need to landscape, sweep, and remove materials from adjacent lots. Prestige Homes builds and manages the private subdivision.

No discharges, trackout, or wind blown trash. DIs have sediment filter bags installed. Just need to clean up site when interior is complete and exterior landscaped.
ESC14-01020 Aging Inspection4/25/20164/25/20164/25/2016 11:47:32 AM PASS
WIP. Need to landscape, sweep, and remove materials from adjacent lots. Prestige Homes builds and manages the private subdivision.

No discharges, trackout, or wind blown trash. DIs have sediment filter bags installed. Just need to clean up site when interior is complete and exterior landscaped.
ESC16-00384 Site Preparation4/22/20164/25/20164/25/2016 10:59:09 AMAPASS
Permit sign and SWPPP information posted. Storm drains on Federal and Victory have sediment bags installed.

Rough grading and utility installation to begin this week. Will use existing stabilized entrance for site access.

Approved.
ESC15-01369 General Inspection4/19/20164/25/20164/25/2016 10:09:57 AMAPASS
follow up to corrections requested 4/19

RP cleaned up loose dirt in street and installed sediment filter bag on the storm drain drop inlet.

Permit sign posted, perimeter wattles installed. RP-GC onsite. Site is back in compllance.
ESC14-00432 BMP Violation4/19/20164/25/20164/25/2016 9:27:20 AMAPASS
check for ESC signs on SWPPP board and on active projects in the foundation phase

ESC permit signs now posted as requested in Aralar sub by Hayden Homes. No other issues or corrections at this time.
ESC14-00678 Aging Inspection4/25/20164/25/20164/25/2016 8:48:25 AM PASS