ELE13-02537
| ELE-Aging Inspection | 4/25/2017 | 4/25/2017 | 4/27/2017 9:09:44 AM | | DONE |
|
|
Still waiting there has not been any inspections on record
|
ELE17-01192
| Electrical Rough-In | 4/25/2017 | 4/25/2017 | 4/25/2017 1:23:11 PM | P | PASS |
|
|
Inspection of wall rough-in on 5th floor SE corner of Clearwater building. Call Pierce as close to 1pm as possible, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo East wall under window on 5th floor ok cover
|
ELE16-03403
| Final | 4/25/2017 | 4/25/2017 | 4/25/2017 12:50:19 PM | P | FAIL |
|
|
would like call ahead; Matt Phone #: ###-#### 406.4 Tamper resistant receptacles required when changing out receptacles 406.4(d)(2) Non grounded receptacles shall be GFCI protected and marked No ground/GFCI protection as was discussed in conference 314.24 Spark rings required when not flush with finished material(kitchen,bath) 110.7 Complete installation shall be free from shorts(triping breaker in panel going phase to phase)
|
ELE16-01134
| Electrical Rough-In | 4/24/2017 | 4/25/2017 | 4/25/2017 10:04:55 AM | A | PASS |
|
|
We are requesting a ceiling inspection for level 9 for tomorrow morning. Our contact is Bobby @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate 9th floor ceilings in units only ok cover
|
ELE17-01126
| Permanent Service | 4/24/2017 | 4/25/2017 | 4/25/2017 8:59:04 AM | A | CANC |
|
|
We will be on the job in the morning, contact is Greg Phone #: ###-#### Inspection requested via web by robert feller Needed r/i and p/s
|
ELE17-01126
| Rough-In Permanent Service | 4/25/2017 | 4/25/2017 | 4/25/2017 8:58:45 AM | P | PASS |
|
|
We will be on the job in the morning, contact is Greg Phone #: ###-#### Inspection requested via web by robert feller Conduit on exrerior bath wall ok cover p/s u/g n ok(1 meter needed)
|
ELE17-00354
| Final | 4/24/2017 | 4/25/2017 | 4/25/2017 8:32:22 AM | A | PASS |
|
|
Chris Phone #: ###-#### Corrections fixed final ok
|