Inspections for the day of: Tuesday, April 25, 2017.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00729 General Inspection4/25/20174/25/20174/28/2017 3:21:59 PM PEND
•Vegetation is establishing.
•New hydro seed has been applied in several areas.
•New wattles have been installed in sensitive areas.
•WIP on SFHs.
•The landscapers working on the sign installation are causing trackout.
•Channel on N side of access road is severely eroded the temporary measures to redirect water do not appear to be working.
•Check dams redesign has been completed
•Sediment ponds have buildup of sediment in the bottom
ESC16-00437 General Inspection4/25/20174/25/20174/28/2017 3:19:19 PM PEND
Silt fence needs repairs where trenching is occurring. The perimeter chain link fencing needs repair as well. The water has risen since the last inspection.
ESC16-00436 General Inspection4/25/20174/25/20174/28/2017 3:19:09 PM PEND
Silt fence needs repairs where trenching is occurring. The perimeter chain link fencing needs repair as well. The water has risen since the last inspection.
ESC16-00435 General Inspection4/25/20174/25/20174/28/2017 3:18:59 PM PEND
Silt fence needs repairs where trenching is occurring. The perimeter chain link fencing needs repair as well. The water has risen since the last inspection.
ESC16-00434 General Inspection4/25/20174/25/20174/25/2017 3:55:09 PM CANC
ESC16-00739 Aging Inspection4/25/20174/25/20174/25/2017 3:54:15 PM PASS
Vertical WIP. No sediment is leaving site. Sign is posted. Trash is contained. No ESC issues.
MIS17-00131 ESC-Conference4/25/20174/25/20174/25/2017 3:51:52 PMPCANC
MIS17-00131 ESC-Conference4/25/20174/25/20174/25/2017 3:51:33 PMPFAIL
Complaint inspection. Driveway project that does not require a permit is tracking out into the street and clogging neighbors gutter. Left a correction notice for contractors to sweep up trackout and clean gutter by end of day 4/27. Follow up inspection scheduled for 4/28. Updated neighbor who filed the complaint about ESC actions taken.
ESC15-00142 Site Final4/25/20174/25/20174/25/2017 2:31:52 PMPPASS
Project is complete. Soil is stable. Temporary BMPs are removed. Okay to final.
ESC16-00165 Aging Inspection4/25/20174/25/20174/25/2017 2:31:02 PM PASS
Project complete. Soil is stable. Okay to final.
ESC16-00165 Site Final4/25/20174/25/20174/25/2017 2:30:15 PMPPASS
Project complete. Soil is stable. Okay to final.
ESC16-00500 Aging Inspection4/25/20174/25/20174/25/2017 1:54:55 PM PASS
No ESC issues observed.
ESC16-00741 General Inspection4/25/20174/25/20174/25/2017 9:43:11 AM PASS
No ESC issues observed.
ESC16-01358 Site Final4/25/20174/25/20174/25/2017 9:23:01 AMPPASS
Demolition complete. SFH started. Okay to final.
ESC16-01358 Site Preparation4/24/20174/25/20174/25/2017 9:22:10 AMAPASS
Sign is posted perimeter controls are in place. Ok to start. Left message with RP detailing ESC requirements. The excavator is tracking out onto sidewalk. Asked RP to ensure this will be swept at the end of each day.
close this permit, check for BMPs for new SFH permit ESC17-00357. Request for early AM inspection.
ESC17-00357 Site Preparation4/25/20174/25/20174/25/2017 9:21:37 AMAPASS
Sign is posted perimeter controls are in place. Ok to start. Left message with RP detailing ESC requirements. The excavator is tracking out onto sidewalk. Asked RP to ensure this will be swept at the end of each day.
ESC15-00955 General Inspection4/25/20174/25/20174/25/2017 8:18:49 AM CANC
ESC16-00731 General Inspection4/25/20174/25/20174/25/2017 8:18:36 AM CANC
ESC15-01150 Aging Inspection4/25/20174/25/20174/25/2017 8:18:23 AM CANC
ESC15-01369 Aging Inspection4/25/20174/25/20174/25/2017 8:18:10 AM CANC