MEC18-01836
| Final | 4/24/2018 | 4/25/2018 | 4/25/2018 4:05:40 PM | P | PASS |
|
|
Call Eric @ ###-#### Phone #: ###-#### Inspection requested via web by Sabrina DeHority- furnace ac coil co ok
|
MEC18-01836
| Pressure Test | 4/24/2018 | 4/25/2018 | 4/25/2018 4:05:11 PM | P | CANC |
|
|
Pressure Test on Flue for high eff furnace installation. Call Eric @ ###-#### Phone #: ###-#### Inspection requested via web by Sabrina DeHority- not needed unconditioned space
|
MEC18-01830
| Rough-in | 4/24/2018 | 4/25/2018 | 4/25/2018 3:45:27 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- need csst approved nail plates on horizontal gas line in wall- b vent at roof needs 1" clearance to combustibles- left correction notice front window
|
MEC18-01830
| Pressure Test | 4/24/2018 | 4/25/2018 | 4/25/2018 3:43:59 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- pressure below 20psi
|
MEC18-01831
| Rough-in | 4/24/2018 | 4/25/2018 | 4/25/2018 3:43:29 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- b vent a roof needs 1" clearance to combustibles- left correction notice on window
|
MEC18-01831
| Pressure Test | 4/24/2018 | 4/25/2018 | 4/25/2018 3:42:23 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- gauge wont zero out
|
MEC18-01816
| Final | 4/24/2018 | 4/25/2018 | 4/25/2018 2:50:30 PM | P | PASS |
|
|
installer David ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- furnace co ok
|
MEC18-00077
| Final | 4/25/2018 | 4/25/2018 | 4/25/2018 2:14:50 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- final ok
|
MEC18-00078
| Final | 4/25/2018 | 4/25/2018 | 4/25/2018 2:11:37 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- final ok
|
MEC18-00082
| Final | 4/25/2018 | 4/25/2018 | 4/25/2018 2:04:42 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- final ok
|
MEC18-01791
| Pressure Test | 4/25/2018 | 4/25/2018 | 4/25/2018 1:22:18 PM | P | NH |
|
|
home owner will give access Phone #: ###-#### Inspection requested via web by Terek Worley- range doorbell- knocked on door- no one answered
|
MEC16-03405
| Conference | 4/24/2018 | 4/25/2018 | 4/25/2018 12:16:07 PM | P | DONE |
|
|
meet home owner at noon for conference- 208- ###-####- home owner will remove combustible mantel and install non-combustible mantel at same location and install per manufactures installation instructions
|
MEC18-01732
| Rough-in | 4/24/2018 | 4/25/2018 | 4/25/2018 11:22:51 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino- need wall framed out for dryer vent can not run in 3.5" wall- remove nail plate south side at ceiling before wall framed out- flue not under pressure- left correction notice on furnace
|
MEC18-01732
| Pressure Test | 4/24/2018 | 4/25/2018 | 4/25/2018 11:21:07 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino- 20lb gas pass
|
MEC17-03751
| Mec-Request for Extension | 4/25/2018 | 4/25/2018 | 4/25/2018 10:40:57 AM | P | PASS |
|
|
Becky Phone #: ###-####- ok
|
MEC18-01754
| Pressure Test | 4/24/2018 | 4/25/2018 | 4/25/2018 10:39:30 AM | A | FAIL |
|
|
Sergio Phone #: ###-####- gauge wont zero
|
MEC18-01818
| Final | 4/24/2018 | 4/25/2018 | 4/25/2018 10:27:18 AM | P | PASS |
|
|
Final Inspection for Ada County Annex job 40864, Contact is Wade Fender ###-####. Phone #: ###-#### Inspection requested via web by Kathy Youngkin- final ok
|
MEC18-01303
| Final | 4/24/2018 | 4/25/2018 | 4/25/2018 10:14:32 AM | A | PASS |
|
|
Pete Phone #: ###-####- furnace ac coil co ok
|
MEC18-00977
| Final | 4/24/2018 | 4/25/2018 | 4/25/2018 9:54:36 AM | A | PASS |
|
|
Blast Witness at 9:30 Please. Phone #: ###-#### Inspection requested via web by Randy Hart- final ok
|
MEC18-00977
| Conference | 4/24/2018 | 4/25/2018 | 4/25/2018 9:54:20 AM | A | PASS |
|
|
Blast Witness at 9:30 Please. Phone #: ###-#### Inspection requested via web by Randy Hart- duct blast test pass
|
MEC17-03751
| Mec-Aging Inspection | 4/25/2018 | 4/25/2018 | 4/25/2018 9:19:49 AM | | PEND |
|
|
WIP- per phone call will schedule inspection when ready in next 4 months
|
MEC18-01813
| Final | 4/23/2018 | 4/25/2018 | 4/25/2018 9:07:44 AM | A | FAIL |
|
|
please call homeowner Linda Gosse when 30 mins in route to arrival. Thanks so much Phone #: ###-#### Inspection requested via web by Rick Montgomery- needs right size fuses in AC disconnect- need drip leg on gas line between gas shut off and furnace
|
MEC18-01799
| Rough-in | 4/24/2018 | 4/25/2018 | 4/25/2018 8:51:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brandon Sorensen- R/I ok
|
MEC18-01799
| Pressure Test | 4/24/2018 | 4/25/2018 | 4/25/2018 8:51:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brandon Sorensen- 20lb gas pass
|
MEC16-03986
| Mec-Aging Inspection | 4/25/2018 | 4/25/2018 | 4/25/2018 8:15:05 AM | | FAIL |
|
|
called no answer- need to call in for final
|
MEC16-02622
| Mec-Aging Inspection | 4/25/2018 | 4/25/2018 | 4/25/2018 8:13:06 AM | | PEND |
|
|
still trying to schedule with homeowners for flue pressure and final
|
MEC16-04126
| Mec-Aging Inspection | 4/25/2018 | 4/25/2018 | 4/25/2018 8:03:15 AM | | DONE |
|
|
|
MEC16-04126
| Final | 4/25/2018 | 4/25/2018 | 4/25/2018 8:03:03 AM | A | PASS |
|
|
|
MEC18-01818
| Final | 4/24/2018 | 4/25/2018 | 4/24/2018 12:13:12 PM | A | CANC |
|
|
Final inspection for Ada County Annex job 40864. Contact is Wade Fender ###-####. Phone #: ###-#### >> Inspection requested via web by Kathy Youngkin Inspection cancelled from web by: Kathy Youngkin
|