ELE19-01499
| Final | 4/25/2019 | 4/25/2019 | 4/25/2019 2:05:14 PM | P | PASS |
|
|
Troy Cobb-Electric Panel labeled, grounding done. Ok final.
|
ELE19-01499
| Permanent Service | 4/24/2019 | 4/25/2019 | 4/25/2019 2:04:56 PM | P | PASS |
|
|
Job is now a panel change instead of just a repair. We''re installing ground rods and a main ground wire. Phone #: ###-#### Inspection requested via web by Troy Cobb p/s u/g rec ok
|
ELE19-00289
| Electrical Rough-In | 4/24/2019 | 4/25/2019 | 4/25/2019 12:57:30 PM | A | PASS |
|
|
ug ; pole bases Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Ok cover grd work for 3 light pole locations.
|
ELE19-01506
| Temporary Service | 4/25/2019 | 4/25/2019 | 4/25/2019 12:33:06 PM | P | PASS |
|
|
Call Clay at ###-#### with any questions Phone #: ###-#### Inspection requested via web by Clayton Morgan t/s u/g n ok
|
ELE19-01507
| Temporary Service | 4/25/2019 | 4/25/2019 | 4/25/2019 12:32:46 PM | P | PASS |
|
|
Call Clay at ###-#### with any questions Phone #: ###-#### Inspection requested via web by Clayton Morgan t/s u/g n ok
|
ELE19-01497
| Electrical Rough-In | 4/24/2019 | 4/25/2019 | 4/25/2019 11:08:03 AM | A | PASS |
|
|
Underground to detached garage. Rough-in and permanent service to be completed at a later date. Phone #: ###-#### Inspection requested via web by Rowdy Monroe Ok cover conduit.
|
ELE19-01410
| Electrical Rough-In | 4/24/2019 | 4/25/2019 | 4/25/2019 10:50:46 AM | A | PASS |
|
|
Partial rough-in / rough in to include break room / rooms 101-106 Phone #: ###-#### Inspection requested via web by jamie berg Ok cover offices E side and breakroom. This is a patient care facility. Redundant ground used.
|
ELE18-04293
| Electrical Rough-In | 4/24/2019 | 4/25/2019 | 4/25/2019 9:54:24 AM | A | PASS |
|
|
Bathroom floor heat ready for cover inspection key will be in front door master bath, and basement bath has the floor heat thanks Phone #: ###-#### Inspection requested via web by Kevin Oderkirk Ok cover flr heat mstr and basement bath.
|