Inspections for the day of: Thursday, April 25, 2019.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-04402 FIRE-Final Inspection4/24/20194/25/20194/25/2019 3:07:48 PMAFAIL
Provide city approved plans and small documents and repair or remove the west exit door exit sign.

Mike Phone #: ###-####
BLD19-01133 FIRE-Final Inspection4/25/20194/25/20194/25/2019 2:32:35 PMPPASS
life safety passed

Stephanie Phone #: ###-####
FIR19-00199 INSP-Sprinkler Rough-in4/25/20194/25/20194/25/2019 1:16:25 PMPPASS
The pendant heads in the hard lids/clouds are ok for cover. The tape will need to be removed from the uprights in the large Lobby prior to a final inspection.

Jessica Phone #: ###-####
FIR19-00215 INSP-Sprinkler Rough-in4/24/20194/25/20194/25/2019 9:23:22 AMAPART
See the city approved plans for apartments marked on the north half of the building where piping is ok for cover.

Gabe Garduno is the contact. Thank you for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
BLD17-02643 FIRE-Final Inspection4/24/20194/25/20194/25/2019 9:13:35 AMAPASS
Life safety passed.

Lin Phone #: ###-####
FIR18-00675 INSP-Sprinkler Rough-in/Hydro4/24/20194/25/20194/25/2019 9:01:15 AMAFAIL
Inspection was for all piping to the south of the dividing doors between the Cafeteria and Gym. Hydro test failed due to missing sprinkler heads, also piping size for the amount of heads at the south end of the corridor does not match plans. Two additional 90's and additional piping needs to be added to the Gym area hydraulic calculation.

CONTACT NAME IS JEFF. INSPECTION IS FOR TEN SPRINKLER HEADS. Phone #: ###-#### Inspection requested via web by Chris Green