ELE96-00861
| INSP - Ele Rough-In/Perm Svc | 4/25/1996 | 4/26/1996 | 4/26/1996 12:00:00 AM | A | FAIL |
|
|
04/25/96 336 - R/I Disapproved loose setscrews and locknuts P/S disapproved grounding electrode conductor not connected to the neutr
|
ELE96-00912
| INSP - Final | 4/25/1996 | 4/26/1996 | 4/26/1996 12:00:00 AM | A | PASS |
|
|
04/25/96 336 - final Ok
|
ELE96-01313
| INSP - Ele Rough-In/Perm Svc | 4/25/1996 | 4/26/1996 | 4/26/1996 12:00:00 AM | A | PASS |
|
|
04/25/96 336 - P/S and R/I Ok
|
ELE95-01830
| INSP - Final | 4/26/1996 | 4/26/1996 | 4/26/1996 12:00:00 AM | P | FAIL |
|
|
04/26/96 336 - REINSPECTION disapproved same as before
|
ELE95-02340
| INSP - Final | 4/26/1996 | 4/26/1996 | 4/26/1996 12:00:00 AM | P | CANC |
|
|
04/26/96 336 - gave to Joe
|
ELE96-00233
| INSP - Electrical Rough-In | 4/25/1996 | 4/26/1996 | 4/26/1996 12:00:00 AM | P | CANC |
|
|
04/25/96 336 - FRI PM cancel won't Be ready
|
ELE96-00948
| INSP - Conference | 4/26/1996 | 4/26/1996 | 4/26/1996 12:00:00 AM | P | PASS |
|
|
04/26/96 336 - at 1:30 ok
|
ELE96-00963
| INSP - Final | 4/26/1996 | 4/26/1996 | 4/26/1996 12:00:00 AM | P | CANC |
|
|
04/26/96 336 - gave to Tom
|
ELE96-01033
| INSP - Electrical Rough-In | 4/26/1996 | 4/26/1996 | 4/26/1996 12:00:00 AM | P | PASS |
|
|
04/26/96 336 - REINSPECTION partial R/I Ok corridor
|
ELE96-01287
| INSP - Electrical Rough-In | 4/24/1996 | 4/26/1996 | 4/26/1996 12:00:00 AM | P | PASS |
|
|
04/25/96 336 - LATE AM..11:00..CIRCUIT EXTENSION R/I ok
|