BLD00-00260
| BLD-Final | 4/25/2000 | 4/26/2000 | 4/26/2000 12:00:00 AM | A | FAIL |
|
|
Rick###-#### late late am Needs mechanical 4/26/00 3:34:25 PM
|
MEC00-00979
| Rough-in | 4/25/2000 | 4/26/2000 | 4/26/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/25/2000 at 15:57:34. Contact: ###-####. Dryer vent needs to be 4/28/00 12:06:18 PM
|
BLD99-03642
| BLD-Final | 4/25/2000 | 4/26/2000 | 4/26/2000 12:00:00 AM | A | PASS |
|
|
Eric, ###-#### - reinspect in late morning Letter on file for 2 locations of safety glazzing. 4/26/00 3:34:18 PM
|
BLD00-00769
| BLD-Foundation | 4/24/2000 | 4/26/2000 | 4/26/2000 12:00:00 AM | A | PART |
|
|
Bob Eason ###-#### Ok poured at this time. 4/26/00 3:32:01 PM
|
BLD00-00309
| BLD-Framing/Rough-in | 4/25/2000 | 4/26/2000 | 4/26/2000 12:00:00 AM | P | NR |
|
|
###-#### Needs plumbing 4/28/00 12:05:58 PM
|
BLD99-03332
| BLD-Wall cover | 4/26/2000 | 4/26/2000 | 4/26/2000 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 04/26/2000 at 07:48:53. Contact: . not done with insulation. 4/28/00 12:05:19 PM
|
BLD00-00616
| BLD-Energy code compliance | 4/26/2000 | 4/26/2000 | 4/26/2000 12:00:00 AM | P | PASS |
|
|
###-#### kent
|
BLD00-00772
| BLD-Footing | 4/26/2000 | 4/26/2000 | 4/26/2000 12:00:00 AM | P | PASS |
|
|
Jerad ###-#### Footing at interior will have another wall built beside it as over-excaved. 4/28/00 12:05:44 PM
|
BLD00-00455
| BLD-Footing | 4/26/2000 | 4/26/2000 | 4/26/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-01137
| BLD-Framing/Rough-in | 4/26/2000 | 4/26/2000 | 4/26/2000 12:00:00 AM | P | FAIL |
|
|
###-#### Set backs not per plan 20" away from house and 14" away from property line, plans shows 5' and 6' at these locations. 4/28/00 12:05:02 PM
|
BLD00-00482
| BLD-Framing/Rough-in | 4/26/2000 | 4/26/2000 | 4/26/2000 12:00:00 AM | P | NR |
|
|
sheer wall insp Shane ###-#### Called me and cancelled. 4/28/00 12:06:08 PM
|