ELE01-01020
| Final | 4/25/2001 | 4/26/2001 | 4/26/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/25/2001 at 17:06:30. Contact: ###-####. ok 4/26/2001 10:30:12 AM
|
ELE01-00268
| Final | 4/24/2001 | 4/26/2001 | 4/26/2001 12:00:00 AM | A | FAIL |
|
|
Call john ###-#### cor.posted called no answer electrical work covered before inspection 4/26/2001 9:55:17 AM
|
ELE01-01138
| Final | 4/25/2001 | 4/26/2001 | 4/26/2001 12:00:00 AM | P | FAIL |
|
|
call jim at ###-#### if not open aircomp. wiring in the gas shed.....pole light on west gate and east gate breaker in gas shed. cor. posted called left message see JF for details 4/26/2001 2:31:39 PM
|
ELE01-01336
| Electrical Rough-In | 4/26/2001 | 4/26/2001 | 4/26/2001 12:00:00 AM | P | FAIL |
|
|
wall cover\\###-#### cor. posted called 300-4 for mc cable 4/26/2001 1:45:46 PM
|
ELE01-01245
| Rough-In Permanent Service | 4/26/2001 | 4/26/2001 | 4/26/2001 12:00:00 AM | P | NH |
|
|
john ###-#### notice posted called left message 4/26/2001 1:46:29 PM
|
ELE01-01344
| Electrical Rough-In | 4/26/2001 | 4/26/2001 | 4/26/2001 12:00:00 AM | P | PART |
|
|
conference ###-#### please call him one half an hour before you go out so that he can meet you there. ok 4/26/2001 3:34:17 PM
|