ELE02-00655
| Final | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | A | PASS |
|
|
ALAN ###-#### ok 4/26/2002 12:20:57 PM
|
ELE02-00748
| Electrical Rough-In | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | A | FAIL |
|
|
BUD ###-#### cor. posted called 300.14, 210.52 (A) (C) 4/26/2002 11:07:31 AM
|
ELE02-01221
| Electrical Rough-In | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | A | PASS |
|
|
paul ###-#### r/i basement ok 4/26/2002 11:39:25 AM
|
ELE02-01188
| Final | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | A | PASS |
|
|
PLEASE CALL GARY ###-#### SO GARY CAN MEET YOU UP THERE TO LET YOU IN.. ok 4/26/2002 11:06:14 AM
|
ELE02-01188
| Permanent Service | 4/26/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | A | PASS |
|
|
p/s o/h rec ok
|
ELE01-04140
| Electrical Rough-In | 4/26/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | P | NR |
|
|
###-#### DAWN talked with contractor need to meet at job site for conference with Marv, Mike or Jack 4/26/2002 6:00:07 PM
|
ELE02-01203
| Rough-In Permanent Service | 4/26/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/26/2002 at 11:17:09. Contact: ###-####. cor. posted called 250.50,52,56,104
shall grd or bond water system too p/s not sub panel, 210.52(ABC) needs guy kit or bolt , wiring covered before inspection partion correction only need access too walls for inspection 4/26/2002 3:35:19 PM
|
ELE02-00748
| Electrical Rough-In | 4/26/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | P | PASS |
|
|
###-#### r/i ok both units 4/26/2002 3:58:27 PM
|
ELE02-01203
| Rough-In Permanent Service | 4/26/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | P | FAIL |
|
|
correctons not made, more violations created, job not ready
|
ELE02-00428
| Electrical Rough-In | 4/26/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | P | PASS |
|
|
UFER ###-#### JIM ok for dirt cover 4/26/2002 4:22:23 PM
|