MEC02-01082
| Rough-in | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 07:52:28. Contact: ###-####. bath exhaust to be 3' from opening 4/26/2002 10:04:24 AM
|
MEC02-01082
| Pressure Test | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 07:52:49. Contact: ###-####.
|
MEC02-01137
| Pressure Test | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | A | FAIL |
|
|
###-####
|
MEC02-00996
| Rough-in | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 10:46:42. Contact: ###-####.
|
MEC02-01079
| Rough-in | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 11:36:32. Contact: ###-####.
|
MEC02-01079
| Pressure Test | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 11:36:46. Contact: ###-####.
|
MEC02-01140
| Final | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | A | NR |
|
|
AIR CARE # ###-#### no contact..left message 4/26/2002 5:09:49 PM
|
MEC02-00515
| Final | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | A | PASS |
|
|
fn kim cell ###-####
|
MEC02-01144
| Pressure Test | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | A | PASS |
|
|
pres test per dixie
|
MEC02-01086
| Rough-in | 4/26/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | A | PASS |
|
|
|
MEC02-01086
| Pressure Test | 4/26/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | A | PASS |
|
|
|
MEC02-00996
| Pressure Test | 4/26/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC02-00996
| Rough-in | 4/26/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | P | PASS |
|
|
|
MEC02-00863
| Rough-in | 4/26/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/26/2002 at 10:27:02. Contact: ###-####. gas failed..r/i on main house failed..posted corrections..studio above garage not ready 4/26/2002 3:19:52 PM
|
MEC02-01121
| Rough-in | 4/26/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/26/2002 at 07:50:14. Contact: ###-####. gas failed...called jeff 4/26/2002 2:10:39 PM
|
MEC02-00793
| Final | 4/26/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 04/26/2002 at 09:09:51. Contact: ###-####. chris called 4/26/2002 2:39:40 PM
|
MEC02-01138
| Final | 4/26/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/26/2002 at 09:21:27. Contact: ###-####.
|
MEC02-01028
| Pressure Test | 4/26/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 350 On 4/26/2002 9:59:29 AM
|
MEC02-01083
| Rough-in | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 15:00:17. Contact: ###-####.
|
MEC02-01083
| Pressure Test | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 15:00:38. Contact: ###-####.
|
MEC02-01078
| Rough-in | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 15:01:10. Contact: ###-####. bath exhaust to be pulled up off rafters and strapped every 4' vertically 4/26/2002 1:11:42 PM
|
MEC02-01078
| Pressure Test | 4/25/2002 | 4/26/2002 | 4/26/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 15:01:25. Contact: ###-####.
|