Inspections for the day of: Monday, April 26, 2004.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy James
TitleMEC-COM/RES INSPECTOR
Phone #794-9461
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC04-01033 Rough-in4/23/20044/26/20044/26/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 4/23/2004 at 9:14:40 AM. Contact: ###-####.
MEC04-01033 Pressure Test4/23/20044/26/20044/26/2004 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 4/23/2004 at 9:15:07 AM. Contact: ###-####. Gas guage does not bottom to zero. Install new guage and retest system. C/N posted on furnace.4/26/2004 10:55:28 AM 4/26/2004 10:55:56 AM
MEC04-00758 Final4/23/20044/26/20044/26/2004 12:00:00 AMAPASS
After 10:00 AM Internet Inspection Request from: Mya Matheson
BLD04-00219 BLD-Framing/Rough-in4/24/20044/26/20044/26/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 4/24/2004 at 4:58:25 PM. Contact: ###-####.
BLD03-02110 BLD-Final4/24/20044/26/20044/26/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 4/24/2004 at 4:59:45 PM. Contact: ###-####.
BLD03-02678 BLD-Conference4/26/20044/26/20044/26/2004 12:00:00 AMPDONE
phil- ###-#### -call 1st before insp
Discussed with homeowner on what is needed for footing/foundation inspection. 4/26/2004 1:29:33 PM
BLD04-00394 BLD-Energy code compliance4/26/20044/26/20044/26/2004 12:00:00 AMPPASS
Ron; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
BLD03-02417 BLD-Final4/24/20044/26/20044/26/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 4/24/2004 at 2:34:58 PM. Contact: ###-####.
BLD03-02415 BLD-Final4/24/20044/26/20044/26/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 4/24/2004 at 2:37:04 PM. Contact: ###-####.
BLD04-00250 BLD-Final4/23/20044/26/20044/26/2004 12:00:00 AMPFAIL
Todd; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
c/n posted in house on kitchen counter. 4/26/2004 3:13:55 PM