Inspections for the day of: Wednesday, April 26, 2006.
Number of inspections: 12
Percentage of inspections complete: 92 %
Percentage of inspections not complete: 8 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01845 FIRE-Final Inspection4/24/20064/24/2006 A 
For final status
FIR06-00140 INSP-Sprinkler Rough-in4/26/20064/26/20064/27/2006 12:46:02 PMPPART
Overhead sprinkler is approved for cover at the areas as marked on stamped plans.
FIR06-00112 INSP-Final Inspection4/24/20064/26/20064/27/2006 7:23:28 AMPFAIL
Waterflow alarms are addressed incorrectly, system has not been pre-tested prior to inspection, to be rescheduled.
BLD05-02474 FIRE-Final Inspection4/26/20064/26/20064/26/2006 2:19:10 PMPPASS
Related permits have been finaled, fire life safety is satisfactory.
BLD05-02475 FIRE-Final Inspection4/26/20064/26/20064/26/2006 2:18:15 PMPPASS
Related permits have been finaled, fire life safety finaled.
BLD05-02476 FIRE-Final Inspection4/26/20064/26/20064/26/2006 2:17:33 PMPPASS
Fire life safety finaled.
BLD05-02358 FIRE-Final Inspection4/25/20064/26/20064/26/2006 12:17:02 PMAFAIL
Three new offices have been built at the NE corner resulting in overspaced sprinklers, and possible alarm notification issues.
FIR05-00681 INSP-Final Inspection4/26/20064/26/20064/26/2006 12:15:43 PMPFAIL
Three new offices at the NE corner have been built which have caused sprinklers to be overspaced.
FIR06-00181 INSP-Final Inspection4/25/20064/26/20064/26/2006 11:38:28 AMAPASS
Fire alarm work passed field inspection.
BLD05-00545 FIRE-Final Inspection4/25/20064/26/20064/26/2006 10:23:39 AMAPASS
Fire life safety passed inspection.
FIR06-00123 INSP-Final Inspection4/26/20064/26/20064/26/2006 10:22:15 AMPPASS
Required corrections have been made, fire sprinkler permit finaled.
FIR05-00406 INSP-Alarm Testing4/20/20064/26/20064/26/2006 8:44:37 AMAPASS
Corrections have been completed, inspection passed.