Inspections for the day of: Wednesday, April 26, 2006.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00256 INSP-Sprinkler Rough-in4/26/20064/26/20064/26/2006 4:23:11 PMPPART
Underground piping from the street to with in approximately 10'-0" of the building is ok to cover. The remaining section will be call in for a later inspection when installed. Per the sprinkler contractor the fire sprinkler monitoring system does not appear to be monitored by an outside agency. I notified ray criner via phone call and email. He stated he would follow up.
FIR05-00406 INSP-Final Inspection4/26/20064/26/20064/26/2006 3:44:57 PMPPASS
permit finaled
FIR05-00586 INSP-Sprinkler Rough-in/Hydro4/25/20064/26/20064/26/2006 2:54:47 PMAPASS
24 hour air test for the dry pipe system has passed. Air pressure was actually gained due to outside temperature.
FIR05-00895 INSP-Alarm Testing4/19/20064/26/20064/26/2006 2:53:46 PMAPASS
Fire alarm permit is finaled
FIR06-00249 INSP-Sprinkler Rough-in4/25/20064/26/20064/26/2006 12:22:39 PMAPASS
Sprinkler piping is ok to cover.
BLD06-00256 FIRE-Final Inspection4/25/20064/26/20064/26/2006 12:22:03 PMAPASS
Fire life safety finaled. All interior doors will need the hardware to be ADA approved and landings updated prior to structural inspection.
FIR06-00144 INSP-Sprinkler Rough-in/Hydro4/25/20064/26/20064/26/2006 9:46:51 AMAFAIL
Need to repair the fire proofing that has been removed for the installation of pipe hangers.
FIR05-00719 INSP-Sprinkler Rough-in/Hydro4/25/20064/26/20064/26/2006 9:42:52 AMAPASS
The sprinkler piping is ok to cover. Insulation had fallen on the upright sprinkler heads but was repaired as I waited.