BLD09-02089
| FIRE-Final Inspection | 4/26/2010 | 4/26/2010 | 4/26/2010 6:23:52 PM | P | FAIL |
|
|
Noted two non-functional exit signs, one EM light to be repaired, post max. occupant load sign, post one PFE with a current certification tag as discussed, see approved plan set and items #3, 8, 10, and 11 on fire code review notes for details pertaining.
|
FIR10-00140
| INSP-Final Inspection | 4/26/2010 | 4/26/2010 | 4/26/2010 6:21:00 PM | P | PASS |
|
|
Scope of fire sprinkler permit work finaled.
|
FIR10-00140
| INSP-Sprinkler Rough-in/Hydro | 4/26/2010 | 4/26/2010 | 4/26/2010 6:20:25 PM | P | PART |
|
|
Rough-in passed.
|
FIR10-00120
| INSP-Final Inspection | 4/26/2010 | 4/26/2010 | 4/26/2010 6:19:49 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR10-00120
| INSP-Sprinkler Rough-in/Hydro | 4/26/2010 | 4/26/2010 | 4/26/2010 6:19:11 PM | P | PART |
|
|
Completed hydrostatic test of the relocated FDC piping.
|
BLD09-00981
| FIRE-Final Inspection | 4/23/2010 | 4/26/2010 | 4/26/2010 6:16:40 PM | P | PASS |
|
|
Corrections per last inspection are finished with the exception of a max occupant load sign to be posted prior to structural final approval as discussed.
|
FIR10-00124
| INSP-Final Inspection | 4/26/2010 | 4/26/2010 | 4/26/2010 6:13:37 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
FIR10-00135
| INSP-Final Inspection | 4/23/2010 | 4/26/2010 | 4/26/2010 6:13:03 PM | P | PASS |
|
|
Per GC, ceiling at the new office will not be built. Added heads at the garage door are acceptable, permit finaled.
|
BLD10-00115
| FIRE-Final Inspection | 4/23/2010 | 4/26/2010 | 4/26/2010 6:08:53 PM | P | FAIL |
|
|
Missing signage at the main entry/exit door, several fire extinguishers are overdue certification and need to be posted.
|
BLD09-02232
| FIRE-Final Inspection | 4/26/2010 | 4/26/2010 | 4/26/2010 11:58:27 AM | A | PASS |
|
|
Fire life safety final approved.
|
FIR10-00124
| INSP-Final Inspection | 4/23/2010 | 4/26/2010 | 4/26/2010 11:57:18 AM | A | PASS |
|
|
C/N items field verified for completion, final inspection passed.
|
BLD10-00585
| FIRE-Final Inspection | 4/22/2010 | 4/26/2010 | 4/26/2010 11:25:24 AM | A | FAIL |
|
|
Noted overspaced fire sprinkler heads at the second floor office, need to post signage at the main entry/exit door- see list of general requirements attatched to permit documents for details.
|