ESC11-00212
| General Inspection | 4/26/2011 | 4/26/2011 | 4/26/2011 2:12:34 PM | | PASS |
|
|
Looks ok,
|
ESC09-00614
| Site Final | 4/25/2011 | 4/26/2011 | 4/26/2011 11:11:17 AM | A | PART |
|
|
Jeremy Phone #: ###-####: Walked site with RP, bare ground has been mulched, tack and seeded, waiting on growth and removal of bmps to enable the ESC permit to be finaled. Contractor will contact ESC when site has achieved final stabilization and permit is ready for close out. A few areas have rilling so repairs are needed.
|
ESC10-00822
| General Inspection | 4/26/2011 | 4/26/2011 | 4/26/2011 9:44:55 AM | | NR |
|
|
No sign of activity, assigned an inspection for 4/28.
|