FIR12-00442
| INSP-Alarm Testing | 4/24/2013 | 4/26/2013 | 4/26/2013 4:20:49 PM | P | PART |
|
|
Phase two fire alarm work as clouded and dated on approved plans passed functional testing.
|
FIR13-00143
| INSP-Final Inspection | 4/25/2013 | 4/26/2013 | 4/26/2013 4:19:49 PM | A | PART |
|
|
Wall post indicator valves must report as a supervisory condition. Remainder of fire alarm work passed inspection.
|
BLD13-00862
| BLD-Final | 4/25/2013 | 4/26/2013 | 4/26/2013 1:39:31 PM | A | FAIL |
|
|
Fire alarm system modifications are necessary due to the tenant remodel work, also need to provide current certification tags for the fire extinguishers.
|
FIR13-00124
| INSP-Final Inspection | 4/24/2013 | 4/26/2013 | 4/26/2013 1:37:27 PM | A | FAIL |
|
|
Noted sync issues at the lobby and common core areas both visual and audible. Remainder of tenant remodel work okayed.
|
BLD12-03151
| FIRE-Final Inspection | 4/24/2013 | 4/26/2013 | 4/26/2013 1:31:12 PM | A | PASS |
|
|
Fire life safety inspection completed satisfactory. EM lighting repaired while on site.
|
FIR13-00071
| INSP-Final Inspection | 4/24/2013 | 4/26/2013 | 4/26/2013 1:27:31 PM | A | PASS |
|
|
Final walkthrough completed, inspection passed. Permit finaled.
|