BLD14-03207
| BLD-Conference | 4/26/2016 | 4/26/2016 | 4/28/2016 5:53:35 AM | P | PART |
|
|
Adam Phone #: ###-#### elec room 9th floor ok to cover
|
BLD14-02889
| BLD-Framing/Rough-in | 4/25/2016 | 4/26/2016 | 4/26/2016 3:56:18 PM | P | CANC |
|
|
Foam and framing inspection area 2 on level 4. I have the city set on site now. Phone #: ###-#### >> Inspection requested via web by Michael Zaccheo Inspection cancelled from web by: Michael Zaccheo
|
BLD15-00814
| BLD-Footing | 4/26/2016 | 4/26/2016 | 4/26/2016 2:32:59 PM | P | CANC |
|
|
John Phone #: ###-####
|
BLD15-00814
| BLD-Foundation | 4/26/2016 | 4/26/2016 | 4/26/2016 2:32:44 PM | P | PASS |
|
|
new retainning wall on old ftgs ok
|
BLD16-00560
| BLD-Energy code compliance | 4/25/2016 | 4/26/2016 | 4/26/2016 2:06:10 PM | P | PASS |
|
|
|
BLD16-00099
| BLD-Conference | 4/26/2016 | 4/26/2016 | 4/26/2016 1:32:58 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Amanda McKee
|
BLD16-00099
| BLD-Framing/Rough-in | 4/26/2016 | 4/26/2016 | 4/26/2016 1:32:46 PM | P | PASS |
|
|
|
BLD16-00667
| BLD-Ceiling Grid Inspection | 4/25/2016 | 4/26/2016 | 4/26/2016 12:04:57 PM | A | PASS |
|
|
would like call ahead; Jared Phone #: ###-####
|
BLD16-01093
| BLD-Final | 4/25/2016 | 4/26/2016 | 4/26/2016 12:03:44 PM | A | PASS |
|
|
Philip Phone #: ###-####
|
BLD16-01093
| DOC - Permit Finaled | 4/26/2016 | 4/26/2016 | 4/26/2016 12:03:34 PM | P | PASS |
|
|
|
BLD15-03128
| BLD-Ceiling Grid Inspection | 4/25/2016 | 4/26/2016 | 4/26/2016 9:18:12 AM | A | PART |
|
|
basement area ok but needs to kick walls and remove the screws from grid to wall
|