Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-00960 Final4/25/20184/26/20184/26/2018 9:43:56 AMAPASS
James, this is a 10'' X 10'' room that was built to house a new Vertex unit for TGM monitoring. There were two light fixtures and a switch installed under this project. Phone #: ###-#### Inspection requested via web by Eric Landberg Final ok
ELE18-01445 Final4/25/20184/26/20184/26/2018 9:43:35 AMAPASS
Phone #: ###-#### Inspection requested via web by brad parsons final ok
ELE18-01255 Final4/25/20184/26/20184/26/2018 9:27:57 AMAPASS
This is the house we looked at with the burned panel just wanted to close out the permit any questions please give me a call thank you. Phone #: ###-#### Inspection requested via web by David Kubik final ok
ELE18-01566 Electrical Rough-In4/25/20184/26/20184/26/2018 9:23:40 AMAPASS
Rough in inspection in aerobic area
Contact Pierre Elskamp
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Surface mounted conduits only rough in ok
ELE18-01566 Electrical Rough-In4/26/20184/26/20184/26/2018 9:09:48 AMPCANC
Call Rafael for questions. Underground inspection of area A and electrical room 103. Phone #: ###-#### Inspection requested via web by Rafael Castillo wrong permit called in
ELE18-01570 Electrical Rough-In4/25/20184/26/20184/26/2018 9:04:44 AMAPASS
Swimming pool underground and bonding Phone #: ###-#### Inspection requested via web by Lars Johnson underground and corner bond only ok to cover