PLM17-01210
| PLM-Aging Inspection | 4/26/2018 | 4/26/2018 | 4/27/2018 10:04:10 AM | | PASS |
|
|
|
PLM17-02993
| Final | 4/26/2018 | 4/26/2018 | 4/26/2018 1:48:42 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM17-02994
| Final | 4/26/2018 | 4/26/2018 | 4/26/2018 1:48:26 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM17-02992
| Final | 4/26/2018 | 4/26/2018 | 4/26/2018 1:48:10 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM18-01693
| Final | 4/25/2018 | 4/26/2018 | 4/26/2018 11:35:06 AM | A | PASS |
|
|
Please call Jim 30 min prior to arrival Phone #: ###-#### Inspection requested via web by Andrea Grigsby
|
PLM17-04701
| Final | 4/25/2018 | 4/26/2018 | 4/26/2018 11:04:03 AM | A | PASS |
|
|
Garage code 2010 Phone #: ###-#### Inspection requested via web by travis prawitz
|
PLM17-05077
| Final | 4/25/2018 | 4/26/2018 | 4/26/2018 10:38:35 AM | A | FAIL |
|
|
#19505 3524 enter Phone #: ###-#### Inspection requested via web by Ann Marie Reyes. 1. ISPC 909.1 The island vent loop must rise as high as possible but no lower than the bottle of the counter. 2. No hot water pressure.
|
PLM17-04282
| Plumbing Rough-in | 4/25/2018 | 4/26/2018 | 4/26/2018 9:54:48 AM | A | PASS |
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Northend/deli roof drains and frozen food vents.ok
|
PLM18-01696
| Groundwork | 4/25/2018 | 4/26/2018 | 4/26/2018 9:16:49 AM | A | PART |
|
|
Work to include: install new rough in of bathroom, drinking fountain, break room double bowl sink, resetting of fixtures including new ADA toilet with a new outside sewage ejection system. Phone #: ###-#### Inspection requested via web by Shane Loar. Roll 4x2 wye so the 2" invert is above the centerline.
|
PLM18-01703
| Other | 4/25/2018 | 4/26/2018 | 4/26/2018 8:56:47 AM | A | PASS |
|
|
Partial inspection on flue pipe installation. Water heater is being installed after and we will schedule that inspection. Phone #: ###-#### Inspection requested via web by McKenna Haycock. Flue pressure test ok Gas 20# test ok. Verify with the installation instructions on your final flue termination from the windo and attic vent.
|
PLM17-03093
| PLM-Aging Inspection | 4/26/2018 | 4/26/2018 | 4/26/2018 7:57:50 AM | | PEND |
|
|
|
PLM18-01472
| Sprinkler (Final) | 4/24/2018 | 4/26/2018 | 4/25/2018 1:02:02 PM | P | PASS |
|
|
John Hand ###-####. Inspection of replacement of backflow device. Phone #: ###-#### Inspection requested via web by Heidi Lukecart
|
PLM18-01682
| Final | 4/24/2018 | 4/26/2018 | 4/25/2018 7:28:41 AM | A | CANC |
|
|
Please call me if access is denied. Thanks. Phone #: ###-#### >> Inspection requested via web by Josh Johnson Inspection cancelled from web by: Josh Johnson
|