Inspections for the day of: Thursday, April 26, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDan Ediger
TitlePLM-INSPECTOR
Phone #869-5166
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM17-01210 PLM-Aging Inspection4/26/20184/26/20184/27/2018 10:04:10 AM PASS
PLM17-02993 Final4/26/20184/26/20184/26/2018 1:48:42 PMPPASS
Phone #: ###-#### Inspection requested via web by Brian Johansen
PLM17-02994 Final4/26/20184/26/20184/26/2018 1:48:26 PMPPASS
Phone #: ###-#### Inspection requested via web by Brian Johansen
PLM17-02992 Final4/26/20184/26/20184/26/2018 1:48:10 PMPPASS
Phone #: ###-#### Inspection requested via web by Brian Johansen
PLM18-01693 Final4/25/20184/26/20184/26/2018 11:35:06 AMAPASS
Please call Jim 30 min prior to arrival Phone #: ###-#### Inspection requested via web by Andrea Grigsby
PLM17-04701 Final4/25/20184/26/20184/26/2018 11:04:03 AMAPASS
Garage code 2010 Phone #: ###-#### Inspection requested via web by travis prawitz
PLM17-05077 Final4/25/20184/26/20184/26/2018 10:38:35 AMAFAIL
#19505
3524 enter Phone #: ###-#### Inspection requested via web by Ann Marie Reyes.
1. ISPC 909.1 The island vent loop must rise as high as possible but no lower than the bottle of the counter.
2. No hot water pressure.
PLM17-04282 Plumbing Rough-in4/25/20184/26/20184/26/2018 9:54:48 AMAPASS
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Northend/deli roof drains and frozen food vents.ok
PLM18-01696 Groundwork4/25/20184/26/20184/26/2018 9:16:49 AMAPART
Work to include: install new rough in of bathroom, drinking fountain, break room double bowl sink, resetting of fixtures including new ADA toilet with a new outside sewage ejection system. Phone
#: ###-#### Inspection requested via web by Shane Loar.
Roll 4x2 wye so the 2" invert is above the centerline.
PLM18-01703 Other4/25/20184/26/20184/26/2018 8:56:47 AMAPASS
Partial inspection on flue pipe installation. Water heater is being installed after and we will schedule that inspection. Phone #: ###-#### Inspection requested via web by McKenna
Haycock.
Flue pressure test ok
Gas 20# test ok.
Verify with the installation instructions on your final flue termination from the windo and attic vent.
PLM17-03093 PLM-Aging Inspection4/26/20184/26/20184/26/2018 7:57:50 AM PEND
PLM18-01472 Sprinkler (Final)4/24/20184/26/20184/25/2018 1:02:02 PMPPASS
John Hand ###-####. Inspection of replacement of backflow device. Phone #: ###-#### Inspection requested via web by Heidi Lukecart
PLM18-01682 Final4/24/20184/26/20184/25/2018 7:28:41 AMACANC
Please call me if access is denied. Thanks. Phone #: ###-#### >> Inspection requested via web by Josh Johnson Inspection cancelled from web by: Josh Johnson