MEC18-05005
| Rough-in | 4/25/2019 | 4/26/2019 | 4/26/2019 3:28:08 PM | P | PASS |
|
|
Cover for 2nd floor call Lou ###-#### Phone #: ###-#### Inspection requested via web by Heather Gransbery - 2nd floor okay to cover grid ceiling
|
MEC19-01625
| Pressure Test | 4/25/2019 | 4/26/2019 | 4/26/2019 10:58:41 AM | A | PASS |
|
|
re inspection Phone #: ###-#### Inspection requested via web by Randy Hart - 20lb gas pass
|
MEC19-01256
| Rough-in | 4/25/2019 | 4/26/2019 | 4/26/2019 10:22:11 AM | A | FAIL |
|
|
Please call Dustin, thank you. Phone #: ###-#### Inspection requested via web by Rhonda Marcum - Need to r4emove sheetrock to be able to inspect duct work to fan and eru. Need to seal joint on duct in basement where it goes through exterior wall. Need to connect unit heater vent to b-vent. Need installation instructions for eru's
|