BLD18-02746
| BLD-Aging Inspection | 4/26/2019 | 4/26/2019 | 4/30/2019 3:02:46 PM | | PEND |
|
|
|
BLD18-03441
| BLD-Aging Inspection | 4/26/2019 | 4/26/2019 | 4/30/2019 3:02:26 PM | | PEND |
|
|
|
BLD18-03496
| BLD-Wall cover | 4/26/2019 | 4/26/2019 | 4/29/2019 9:31:24 AM | P | PART |
|
|
Colby Phone #: ###-####,, upper firewall.. work in progress
|
BLD18-04220
| BLD-Final | 4/26/2019 | 4/26/2019 | 4/29/2019 9:30:36 AM | P | NR |
|
|
Mike Phone #: ###-####,, needs Blower door test,, fire caulking
|
BLD19-00202
| BLD-Wall Bracing | 4/26/2019 | 4/26/2019 | 4/26/2019 3:56:30 PM | P | PART |
|
|
shear // Zach Phone #: ###-####,, covered,, appears ok
|
BLD18-03495
| BLD-Wall cover | 4/26/2019 | 4/26/2019 | 4/26/2019 3:56:06 PM | P | PART |
|
|
Colby Phone #: ###-####,, 2nd floor,, work in progress
|
BLD18-03494
| BLD-Wall cover | 4/26/2019 | 4/26/2019 | 4/26/2019 3:55:34 PM | P | PART |
|
|
Colby Phone #: ###-####,, 2nd floor work in progress
|
BLD19-00927
| BLD-Wall Bracing | 4/26/2019 | 4/26/2019 | 4/26/2019 3:05:18 PM | P | PASS |
|
|
shear and framing // Trent Phone #: ###-####,, wall bracing ok,, needs trades for frame
|
BLD18-04248
| BLD-Footing | 4/25/2019 | 4/26/2019 | 4/26/2019 1:59:23 PM | P | PART |
|
|
Shawn-pour time2:00 Phone #: ###-####,, work in progress,, basement footings
|
BLD19-00322
| BLD-Framing/Rough-in | 4/25/2019 | 4/26/2019 | 4/26/2019 12:04:07 PM | A | FAIL |
|
|
Monica Phone #: ###-####,, correction posted,, needs.. truss engineering, strap beam to plate, point load studs under girder, toenails, fasten girder per engineering..
|
BLD18-04240
| BLD-Foundation | 4/25/2019 | 4/26/2019 | 4/26/2019 11:41:41 AM | A | PART |
|
|
Dustin-stem wall Phone #: ###-####,, work in progress,, missed layout on footings in some areas,, dowelled in and re-pour with wall ok
|
BLD19-01288
| BLD-Conference | 4/25/2019 | 4/26/2019 | 4/26/2019 11:27:56 AM | A | DEFR |
|
|
contact John Hoyne ###-#### to arrange time to meet for inspection of previous fire damage.// Asbestos work going on,, will re call the inspection after abatement is complete
|
BLD18-01896
| BLD-Final | 4/25/2019 | 4/26/2019 | 4/26/2019 11:25:24 AM | A | PASS |
|
|
Charlie Phone #: ###-####,, set backs ok per historical
|
BLD18-01896
| DOC - Permit Finaled | 4/26/2019 | 4/26/2019 | 4/26/2019 11:24:49 AM | P | PASS |
|
|
Historical, T.V. said that the setbacks are ok as is,, existing?
|
BLD19-00850
| BLD-Foundation | 4/25/2019 | 4/26/2019 | 4/26/2019 11:03:15 AM | A | PART |
|
|
Ren Phone #: ###-####,, ICF walls,, work in progress
|
MIS18-00240
| DOC - Permit Finaled | 4/26/2019 | 4/26/2019 | 4/26/2019 10:48:36 AM | P | PASS |
|
|
|
MIS18-00237
| DOC - Permit Finaled | 4/26/2019 | 4/26/2019 | 4/26/2019 10:48:03 AM | P | PASS |
|
|
|
BLD18-03228
| BLD-Blower Door Test Results | 4/25/2019 | 4/26/2019 | 4/26/2019 10:47:46 AM | A | PASS |
|
|
Dennis Phone #: ###-####/// 3.5
|
BLD18-03228
| BLD-Final | 4/25/2019 | 4/26/2019 | 4/26/2019 10:47:29 AM | A | PASS |
|
|
Dennis Phone #: ###-####
|
BLD18-03228
| DOC - Permit Finaled | 4/26/2019 | 4/26/2019 | 4/26/2019 10:47:09 AM | P | PASS |
|
|
|