ELE00-00693
| Final | 4/26/2000 | 4/27/2000 | 4/27/2000 12:00:00 AM | A | PART |
|
|
on the inside of the bank only Kathy ###-#### Temp. occ. 4/28/00 9:19:27 AM
|
ELE00-00836
| Electrical Rough-In | 4/26/2000 | 4/27/2000 | 4/27/2000 12:00:00 AM | A | PART |
|
|
Main service panel: conference 4/28/00 9:19:21 AM
|
ELE00-01434
| Final | 4/26/2000 | 4/27/2000 | 4/27/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/26/2000 at 16:41:40. Contact: ###-####. No access; called contractor, will reschedule. 4/28/00 9:19:41 AM
|
ELE00-00730
| Permanent Service | 4/27/2000 | 4/27/2000 | 4/27/2000 12:00:00 AM | P | FAIL |
|
|
###-####. NEC 551-71 all 125 volt sql. phase 20 amp. recetacles shall be GFCI prtected. Also inspector needs to see make plug for camper correction posted.
|
ELE00-01487
| Electrical Rough-In | 4/27/2000 | 4/27/2000 | 4/27/2000 12:00:00 AM | P | PART |
|
|
conference frank ###-#### Conference; service panel connections. 4/28/00 8:55:19 AM
|
ELE00-01434
| Final | 4/27/2000 | 4/27/2000 | 4/27/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/27/2000 at 10:31:28. Contact: ###-####. Gas pipe shall be bonded; EMT conduit shall be supported; J-Box covered lid (old fuse panel) shall be secured. 4/28/00 12:11:23 PM
|
ELE00-01314
| Electrical Rough-In | 4/27/2000 | 4/27/2000 | 4/27/2000 12:00:00 AM | P | FAIL |
|
|
floor ###-#### Bends in PVC conduit shall not exceed 360 deg. underfloor raceway. 4/28/00 8:55:49 AM
|
ELE99-03254
| Final | 4/26/2000 | 4/27/2000 | 4/27/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 04/26/2000 at 09:35:08. Contact: ###-####. Final ok 4/28/00 8:56:18 AM
|
ELE98-03567
| Electrical Rough-In | 4/26/2000 | 4/27/2000 | 4/27/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/26/2000 at 12:42:44. Contact: ###-####. Ceiling R/I; 2nd & 3rd floor; patient rooms, corridor. 4/28/00 8:54:59 AM
|