BLD00-03516
| BLD-Framing/Rough-in | 4/26/2001 | 4/27/2001 | 4/27/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/26/2001 at 10:37:03. Contact: ###-####. struc. engn. tim to submit puddle size and perimtor spacing. spoke with tim on phone. 4/27/2001 3:35:54 PM
|
BLD00-02920
| BLD-Wall cover | 4/26/2001 | 4/27/2001 | 4/27/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/26/2001 at 12:30:38. Contact: ###-####. 4 hr wall ok to procced/ coridor ok at south fan deck. 4/27/2001 1:26:26 PM
|
BLD01-00618
| BLD-Framing/Rough-in | 4/26/2001 | 4/27/2001 | 4/27/2001 12:00:00 AM | A | PART |
|
|
###-#### kitchen ok for cover seleants required to meet engery code pending mech approval. 4/27/2001 9:14:42 AM
|
BLD01-00409
| BLD-Framing/Rough-in | 4/27/2001 | 4/27/2001 | 4/27/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/27/2001 at 07:17:25. Contact: ###-####. reinsp. fee posted work from previous c/n not performed. 4/27/2001 3:05:36 PM
|
BLD01-00141
| BLD-Final | 4/27/2001 | 4/27/2001 | 4/27/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 04/27/2001 at 08:32:12. Contact: ###-####.
|
BLD01-00130
| BLD-Foundation | 4/27/2001 | 4/27/2001 | 4/27/2001 12:00:00 AM | P | PART |
|
|
shear insp Scott ###-####
|
BLD00-01563
| BLD-Concrete | 4/26/2001 | 4/27/2001 | 4/27/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 04/26/2001 at 07:27:56. Contact: ###-####. placed with special insp pending report. 4/27/2001 1:28:42 PM
|