Inspections for the day of: Friday, April 27, 2001.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM00-03202 Plumbing Rough-in4/26/20014/27/20014/27/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 04/26/2001 at 13:12:45. Contact: ###-####. west rd center 8" roof to 2' below fan deck ceiling 4/26/2001 4:00:36 PM
PLM01-01294 Sprinkler (Final)4/26/20014/27/20014/27/2001 12:00:00 AMPFAIL
Scheduled by Inspector: 330 On 4/26/2001 2:48:34 PM lower shutoff valve to 36" below grade, min. 160 psi poly upstream of dcva 4/27/2001 2:08:00 PM
PLM00-03202 Roof Drains4/27/20014/27/20014/27/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 04/27/2001 at 07:38:57. Contact: ###-####. 2 more rd's, west end 4/27/2001 4:08:21 PM
PLM01-01298 Sprinkler (Final)4/27/20014/27/20014/27/2001 12:00:00 AMPFAIL
rebecca ###-#### - for backflow 2 clamps with drivers 180 deg. apart required at 4/27/2001 2:21:02 PM each joint on main water tie in. 4/27/2001 2:21:17 PM
PLM01-00753 Final4/27/20014/27/20014/27/2001 12:00:00 AMPFAIL
partial fn - basement bath will not finish until new swr line- scott ###-#### cap abandoned waste line in basement bath, seal all 3 wall penatrations in basement bath, the baement bath is future, wont be active till sewer line in run in the street and connection made, an additional permit will be required at that time. 4/27/2001 2:50:08 PM