Inspections for the day of: Friday, April 27, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-01297 Water and/or Sewer4/26/20014/27/20014/27/2001 12:00:00 AMAPASS
###-####
PLM01-01302 Groundwork4/26/20014/27/20014/27/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/26/2001 at 15:38:10. Contact: ###-####.
PLM01-00667 Final4/26/20014/27/20014/27/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 04/26/2001 at 15:39:04. Contact: ###-####.
PLM01-01303 Plumbing Rough-in4/26/20014/27/20014/27/2001 12:00:00 AMAPASS
###-####
PLM01-01200 Sprinkler (Final)4/27/20014/27/20014/27/2001 12:00:00 AMAPASS
Scheduled by Inspector: 360 On 4/27/2001 10:17:18 AM
PLM01-01318 Water and/or Sewer4/27/20014/27/20014/27/2001 12:00:00 AMPPASS
Scheduled by Inspector: 360 On 4/27/2001 4:25:21 PM
PLM01-01307 Sprinkler (Final)4/27/20014/27/20014/27/2001 12:00:00 AMPFAIL
###-#### piping from shut off and drain valve's to rp need 's to be 160 p.s.i. rating and graded back to drain valve 4/27/2001 12:22:55 PM
PLM01-01308 Plumbing Rough-in4/27/20014/27/20014/27/2001 12:00:00 AMPPASS
###-####
PLM01-01314 Water and/or Sewer4/27/20014/27/20014/27/2001 12:00:00 AMPPASS
###-####- page swr & water
PLM01-01317 Plumbing Rough-in4/27/20014/27/20014/27/2001 12:00:00 AMPPASS
###-####
PLM01-00255 Final4/27/20014/27/20014/27/2001 12:00:00 AMPPART
###-#### drain for steam unit rp need's to be piped to outside. 4/27/2001 1:40:36 PM