MEC04-00627
| Final | 4/27/2004 | 4/27/2004 | 4/27/2004 11:13:42 AM | P | CANC |
|
|
Jack; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Inspection cancelled from web by: Aimee Hughes
|
MEC04-00626
| Final | 4/27/2004 | 4/27/2004 | 4/27/2004 11:13:35 AM | P | CANC |
|
|
Jack; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Inspection cancelled from web by: Aimee Hughes
|
MEC04-00996
| Pressure Test | 4/26/2004 | 4/27/2004 | 4/27/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 4/26/2004 at 12:31:08 PM. Contact: ###-####. gas only to future appliances...corrections done..20lb test ok 4/27/2004 11:20:52 AM
|
MEC04-01073
| Rough-in | 4/26/2004 | 4/27/2004 | 4/27/2004 12:00:00 AM | A | FAIL |
|
|
###-#### Steve...need approved set of plans on site 4/27/2004 11:02:40 AM
|
MEC04-00332
| Final | 4/26/2004 | 4/27/2004 | 4/27/2004 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 4/26/2004 at 3:48:46 PM. Contact: ###-####. run secondary drains independent of each other..check gas flex connector sizes for furnaces 4/27/2004 11:03:15 AM
|
MEC04-00622
| Final | 4/26/2004 | 4/27/2004 | 4/27/2004 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 4/26/2004 at 4:46:01 PM. Contact: ###-####. run primary and secondary drains independent of each other 4/27/2004 10:15:42 AM
|
MEC04-01054
| Rough-in | 4/27/2004 | 4/27/2004 | 4/27/2004 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
MEC04-01054
| Pressure Test | 4/27/2004 | 4/27/2004 | 4/27/2004 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
MEC04-00911
| Rough-in | 4/27/2004 | 4/27/2004 | 4/27/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/27/2004 at 8:30:28 AM. Contact: ###-####.
|
MEC04-01076
| Rough-in | 4/27/2004 | 4/27/2004 | 4/27/2004 12:00:00 AM | P | FAIL |
|
|
###-#### AN F/P FLUES ON EACH UNIT TO BE 18" FROM FIRE WALL...GAS TEST ON BOTH SIDES OK AT 20LB 4/27/2004 3:48:55 PM
|
MEC04-01079
| Rough-in | 4/27/2004 | 4/27/2004 | 4/27/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/27/2004 at 9:17:00 AM. Contact: ###-####.
|
MEC04-01055
| Rough-in | 4/27/2004 | 4/27/2004 | 4/27/2004 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
MEC04-01055
| Pressure Test | 4/27/2004 | 4/27/2004 | 4/27/2004 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|