Inspections for the day of: Wednesday, April 27, 2011.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00444 General Inspection4/27/20114/27/20114/27/2011 5:36:03 PM PASS
ESC09-00538 General Inspection4/27/20114/27/20114/27/2011 3:16:15 PM DONE
Permi finalled.
ESC09-00538 DOC - Permit Finaled4/27/20114/27/20114/27/2011 3:06:36 PMPPASS
ESC10-00361 DOC - Permit Finaled4/27/20114/27/20114/27/2011 2:05:39 PMPPASS
ESC09-00676 BMP Violation4/25/20114/27/20114/27/2011 11:16:56 AMAPASS
ESC10-00010 General Inspection4/27/20114/27/20114/27/2011 10:01:34 AM FAIL
Verbal to RP: Cleanup all tracking within the alley way behind the homes off of Timbersaw. Will re-inspect on 4/28/2011AM.
ESC11-00180 Site Preparation4/27/20114/27/20114/27/2011 10:00:09 AMPFAIL
Verbal to RP:
Must provide storm drain inlet protection on all storm drains within the alleyways of where new construction has begun. Clean up all sediment trackingwithin the alleyway on to Pauralt st.
Also maintain and replace storm drain inlets protection throughout the subdivision that Hunter Homes has impacted. Will follow up on 4/28/2011
ESC11-00176 BMP Violation4/25/20114/27/20114/27/2011 9:11:26 AMAFAIL
Spoke with the Grading contractor and he explained that they are waiting for the soil to dry out. But will have the area along the sediment barrier removed by the end of the day. Will re-inspect on 4/28/2011AM.
ESC07-00386 General Inspection4/27/20114/27/20114/27/2011 9:09:43 AM PASS

ESC10-00531 BMP Violation4/25/20114/27/20114/27/2011 9:09:32 AMAFAIL
Message RP:
the correction from the previous inspection has not been corrected. Must have it corrected by the end of the day. Will re-inspect on 4/28/2011am
ESC09-00470 General Inspection4/27/20114/27/20114/27/2011 9:07:47 AM PART
The RP has made it aware he will begin on the berm along the area of the subdivision that run paralell to Warm Springs Rd. After the berm is shaped it will have seed hand broadcasted over the area and other areas whea the vegitation has not been estabished. Will re-inspect in the near future.