ELE13-02418
| ELE-Aging Inspection | 4/27/2016 | 4/27/2016 | 4/29/2016 4:17:13 PM | | CANC |
|
|
|
ELE13-02038
| ELE-Aging Inspection | 4/27/2016 | 4/27/2016 | 4/29/2016 4:16:43 PM | | CANC |
|
|
|
ELE16-00660
| Final | 4/27/2016 | 4/27/2016 | 4/27/2016 3:35:58 PM | P | PASS |
|
|
Dan Phone #: ###-#### Final ok
|
ELE16-00336
| Final | 4/27/2016 | 4/27/2016 | 4/27/2016 3:26:50 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Thomas Final ok
|
ELE16-01321
| Electrical Rough-In | 4/27/2016 | 4/27/2016 | 4/27/2016 2:29:01 PM | P | PASS |
|
|
Rewired the kitchen. Call before you go. Thanks, Greg Phone #: ###-#### Inspection requested via web by Greg Idsinga Questioned existing switching system of house and contractor informed it is all low voltage system to remain. Kitchen remodel rough in ok cover
|
ELE16-01305
| Final | 4/27/2016 | 4/27/2016 | 4/27/2016 1:47:10 PM | P | FAIL |
|
|
Inspection requested via web by Matthew White 250.28- Main bonding jumper shall be installed on existing main breaker panel. 250.53(D)(2)- underground water pipe shall have supplemental rod installed. Approved P/S to occupied with corrections to be completed for final.
|
ELE16-01305
| Permanent Service | 4/27/2016 | 4/27/2016 | 4/27/2016 1:46:34 PM | P | PASS |
|
|
Inspection requested via web by Matthew White p/s o/h rec ok
|
ELE16-01330
| Rough-In Permanent Service | 4/26/2016 | 4/27/2016 | 4/27/2016 1:27:28 PM | P | CANC |
|
|
late in day please! Ok for Id power to restore power Phone #: ###-#### Inspection requested via web by Randy Fletcher Needed conference
|
ELE16-01330
| Conference | 4/27/2016 | 4/27/2016 | 4/27/2016 1:27:17 PM | P | DONE |
|
|
late in day please! Ok for Id power to restore power Phone #: ###-#### Inspection requested via web by Randy Fletcher Discussed location of metermain under existing deck where walls have been built to enclose under deck area. Checked with Daryl Degrange and determined that area not concidered as interior or part of structure. Underground service entrance to be installed in sch 80 PVC 3 1/2' verticle to metermain than fused there is acceptable. Contractor to change dryer and range receptacles to 4 wire and bond plumbing at water heater and install a ground rod to supplement.
|
ELE16-01235
| Final | 4/26/2016 | 4/27/2016 | 4/27/2016 12:36:12 PM | A | PASS |
|
|
Approved plans onsite. Please call Ryan King with any questions. ###-#### Phone #: ###-#### Inspection requested via web by Ryan King Final ok
|
ELE16-01326
| Final | 4/26/2016 | 4/27/2016 | 4/27/2016 10:47:45 AM | A | FAIL |
|
|
Robert Phone #: ###-#### 110.26- Work clearance for service pedistal shall be 36" deep and 30" wide shall be maintained. The addition of heat pump placed 18" in front of pedistal is in this space.
|
ELE16-01319
| Electrical Rough-In | 4/27/2016 | 4/27/2016 | 4/27/2016 10:01:54 AM | A | PASS |
|
|
Cal, gate beside garage is open walk to back yard. Phone #: ###-#### Inspection requested via web by cal crosby Garage addition rough in ok cover
|
ELE16-01292
| Temporary Service | 4/26/2016 | 4/27/2016 | 4/27/2016 9:01:35 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn t/s u/g n ok
|
ELE15-01035
| Final | 4/27/2016 | 4/27/2016 | 4/27/2016 8:47:50 AM | A | PASS |
|
|
garage code 0813 Phone #: ###-#### Inspection requested via web by cal crosby Final ok
|