FIR16-00738
| INSP-Sprinkler Rough-in/Hydro | 4/26/2017 | 4/27/2017 | 4/27/2017 3:30:31 PM | A | FAIL |
|
|
24 hour air test failed.
|
FIR17-00002
| INSP-Sprinkler Rough-in | 4/26/2017 | 4/27/2017 | 4/27/2017 3:29:48 PM | P | PART |
|
|
Plans need to be resubmitted for plan modifications that include the actual pipe routing and fitting counts, branchline restraints are missing on the two most south west branchlines, branch line restraints are required on the grid branchlines (41'max), FDC is not approved at its current location, heads are spaced too far off of a wall at the west end of the building, piping over Conference room can be recovered, the nuts on the side sammys can be unthreaded by finger so they need to be tightened down.
|
FIR17-00122
| INSP-Sprinkler Rough-in | 4/27/2017 | 4/27/2017 | 4/27/2017 3:19:29 PM | P | PASS |
|
|
Rough-in passed. I questioned some pipe connections that will need to be verified prior to a final
|
BLD16-02699
| FIRE-Final Inspection | 4/27/2017 | 4/27/2017 | 4/27/2017 1:51:55 PM | P | FAIL |
|
|
repair the two exit discharge lights at the main exit
|
BLD15-00048
| FIRE-Final Inspection | 4/26/2017 | 4/27/2017 | 4/27/2017 1:48:52 PM | P | PASS |
|
|
life safety passed
|
BLD16-03038
| FIRE-Final Inspection | 4/27/2017 | 4/27/2017 | 4/27/2017 11:15:38 AM | P | PASS |
|
|
life safety passed
|
BLD17-00973
| FIRE-Final Inspection | 4/27/2017 | 4/27/2017 | 4/27/2017 10:38:10 AM | P | PASS |
|
|
life safety passed
|
FIR16-00454
| INSP-Final Inspection | 4/26/2017 | 4/27/2017 | 4/27/2017 10:37:02 AM | P | FAIL |
|
|
Horns do not sync as required
|
BLD16-01092
| FIRE-Final Inspection | 4/26/2017 | 4/27/2017 | 4/27/2017 10:32:11 AM | A | CANC |
|
|
still waiting for the fire alarm permit to be addressed
|
FIR16-00588
| INSP-Final Inspection | 4/26/2017 | 4/27/2017 | 4/27/2017 10:31:36 AM | A | PASS |
|
|
permit finaled
|
FIR17-00172
| INSP-Final Inspection | 4/26/2017 | 4/27/2017 | 4/26/2017 12:12:19 PM | A | PASS |
|
|
permit finaled
|