Inspections for the day of: Wednesday, April 28, 1999.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM98-02371 INSP - Final4/28/19994/28/19994/28/1999 12:00:00 AM PASS
/ / 330 - WELL DISCONNECT OK
PLM99-00578 INSP - Final4/28/19994/28/19994/28/1999 12:00:00 AM PASS
/ / 330 -
PLM99-01232 INSP - Final4/27/19994/28/19994/28/1999 12:00:00 AMAPASS
04/28/99 330 - ###-#### JEFF//SEWER LINE ONLY
PLM99-01324 INSP - Final4/27/19994/28/19994/28/1999 12:00:00 AMAPART
04/28/99 330 - ###-#### PAUL//SPRINKLER DID NOT DO TIE IN FROM WATER LINE//ONLY FROM T UP tie in ok to cover needs a test yet
PLM99-01335 INSP - Final4/28/19994/28/19994/28/1999 12:00:00 AMPPASS
04/28/99 330 - after 1:00/ June ###-####
PLM99-01343 INSP - Final4/28/19994/28/19994/28/1999 12:00:00 AMPPASS
04/28/99 330 - darren ###-#### back flow insp
PLM99-01344 INSP - Final4/28/19994/28/19994/28/1999 12:00:00 AMPPASS
04/28/99 330 - darren--###-#### backflow insp
PLM99-01345 INSP - Final4/28/19994/28/19994/28/1999 12:00:00 AMPPART
04/28/99 330 - darren--###-#### back flow insp tie in ok, ownere will ne
PLM99-01346 INSP - Plumbing Rough-in4/28/19994/28/19994/28/1999 12:00:00 AMPFAIL
04/28/99 330 - ###-#### gary waternin 2x4 exterior wall, w&v test failed
PLM99-00578 INSP - Final4/28/19994/28/19994/28/1999 12:00:00 AMPFAIL
04/28/99 330 - reinspect/ Scott ###-####/ key above door still no sink i
PLM99-00758 INSP - Final4/28/19994/28/19994/28/1999 12:00:00 AMPPASS
04/28/99 330 - key above front door\\###-####
PLM99-00476 INSP - Final4/28/19994/28/19994/28/1999 12:00:00 AMPPASS
04/28/99 330 - reinspection betty ###-#### door will be open
PLM98-01666 INSP - Plumbing Rough-in4/28/19994/28/19994/28/1999 12:00:00 AMPFAIL
04/28/99 330 - ###-#### FRED//RI water system ok, south bath is close be