ELE00-00029
| Final | 4/27/2000 | 4/28/2000 | 4/28/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 04/27/2000 at 13:45:44. Contact: ###-####. called to meet left message 5/1/00 10:22:35 AM
|
ELE00-01452
| Electrical Rough-In | 4/27/2000 | 4/28/2000 | 4/28/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/27/2000 at 13:55:39. Contact: ###-####. u/g n ok 5/1/00 10:22:52 AM
|
ELE00-01497
| Electrical Rough-In | 4/27/2000 | 4/28/2000 | 4/28/2000 12:00:00 AM | A | PASS |
|
|
Chad ###-####
|
ELE00-00613
| Electrical Rough-In | 4/27/2000 | 4/28/2000 | 4/28/2000 12:00:00 AM | A | PART |
|
|
ceiling r/i for 3rd floor Kelly ###-####
|