Inspections for the day of: Friday, April 28, 2000.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00455 BLD-Foundation4/27/20004/28/20004/28/2000 12:00:00 AMAPART
###-####. Ok except garage (int. side) footing not 20" as shown on plans. Contractor on site will correct with slab placement.
BLD00-00705 BLD-Framing/Rough-in4/27/20004/28/20004/28/2000 12:00:00 AMAFAIL
shear nailing insp Tom ###-####. C/N posted.
BLD00-00333 BLD-Final4/27/20004/28/20004/28/2000 12:00:00 AMAPASS
key over front door ###-####
BLD99-03288 BLD-Framing/Rough-in4/27/20004/28/20004/28/2000 12:00:00 AMAFAIL
sheer nailing Chip ###-####. C/N posted
BLD00-00432 BLD-Framing/Rough-in4/27/20004/28/20004/28/2000 12:00:00 AMAFAIL
fr insp--corrections are done -issue on hanger in gar-frank-###-#### mobile--office ###-####. Still has 3 corrections re-posted, will allow to start some sheetrocking, due to some complications.
BLD00-00047 BLD-Final4/27/20004/28/20004/28/2000 12:00:00 AMAFAIL
Dwayne ###-####. Posted C/N.
BLD00-01169 BLD-Footing4/27/20004/28/20004/28/2000 12:00:00 AMPPART
Dave ###-#### contractor Gary Brown ###-#### Rebar not in place at all areas. 5/1/00 3:26:36 PM
BLD99-03460 BLD-Final4/28/20004/28/20004/28/2000 12:00:00 AMPPASS
###-####
BLD99-03468 BLD-Final4/28/20004/28/20004/28/2000 12:00:00 AMPPASS
###-####
BLD00-01085 BLD-Footing4/28/20004/28/20004/28/2000 12:00:00 AMPPASS
###-#### Footing ok 5/1/00 3:26:50 PM
BLD00-00309 BLD-Framing/Rough-in4/28/20004/28/20004/28/2000 12:00:00 AMPFAIL
###-####--dwayne fr insp C/N 5/1/00 3:27:00 PM
BLD99-02911 BLD-Framing/Rough-in4/28/20004/28/20004/28/2000 12:00:00 AMPCANC
DWIGHT ###-#### FR Unable to do 5/1/00 3:27:08 PM
BLD00-00705 BLD-Framing/Rough-in4/28/20004/28/20004/28/2000 12:00:00 AMPFAIL
shear nailing tom ###-#### C/N posted 5/1/00 3:26:42 PM