ELE03-00386
| Final | 4/25/2003 | 4/28/2003 | 4/28/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 4/25/2003 at 8:04:29 AM. Contact: ###-####. ok finl blanket permit 4/28/2003 9:46:27 AM
|
ELE03-01212
| Rough-In Permanent Service | 4/25/2003 | 4/28/2003 | 4/28/2003 12:00:00 AM | A | PASS |
|
|
ALAN; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok cover ri p/s u/g n ok 4/28/2003 9:45:41 AM
|
ELE03-00981
| Electrical Rough-In | 4/25/2003 | 4/28/2003 | 4/28/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 4/25/2003 at 10:06:31 AM. Contact: ###-####.-trench insp ok cover underground conduit 4/28/2003 11:03:06 AM
|
ELE03-01188
| Electrical Rough-In | 4/25/2003 | 4/28/2003 | 4/28/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 4/25/2003 at 4:20:26 PM. Contact: ###-####. p/s o/h n ok correction ri all make up to be done at ri inspection detached garage not ready 4/28/2003 10:25:53 AM
|
ELE03-00567
| Final | 4/28/2003 | 4/28/2003 | 4/28/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 4/28/2003 at 8:29:36 AM. ok final 4/28/2003 4:54:28 PM
|
ELE03-01166
| Final | 4/28/2003 | 4/28/2003 | 4/28/2003 12:00:00 AM | P | FAIL |
|
|
deric; Phone #: ###-#### Internet Inspection Request from: Darla Downs corrections NEC110.3(B) 25amp protection for air-cond. NEC250.140 NEC210.63 4/28/2003 2:41:58 PM
|
ELE03-00314
| Final | 4/28/2003 | 4/28/2003 | 4/28/2003 12:00:00 AM | P | NH |
|
|
jason; Phone #: ###-#### Internet Inspection Request from: Annette Moore no access called contractor to make sure & get us access or we will charge reinspection fee 4/28/2003 4:03:42 PM
|
ELE03-01176
| Electrical Rough-In | 4/28/2003 | 4/28/2003 | 4/28/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 4/28/2003 at 9:32:55 AM. Contact: ###-####. ok cover under slab conduit 4/28/2003 4:53:56 PM
|