Inspections for the day of: Friday, April 28, 2006.
Number of inspections: 9
Percentage of inspections complete: 89 %
Percentage of inspections not complete: 11 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01845 FIRE-Final Inspection4/24/20064/24/2006 A 
For final status
FIR05-00846 INSP-Final Inspection4/27/20064/28/20065/1/2006 2:02:35 PMAPART
On site confrence to determine hydrostatic testing requirements.
BLD05-02482 FIRE-Final Inspection4/28/20064/28/20064/28/2006 4:04:00 PMPFAIL
Project is not in condition for a final life safety inspection, missing doors, hardware, need to provide approved building address, stair hand rails are not installed, need to test emergency lighting etc.
FIR06-00128 INSP-Sprinkler Rough-in/Hydro4/27/20064/28/20064/28/2006 3:23:44 PMPPART
Inspection for cover at the hard lid restrooms in the basement, noted one hanger ring to be changed at an arm over.
FIR06-00276 INSP-Final Inspection4/28/20064/28/20064/28/2006 1:22:00 PMPPART
Overhead sprinkler work is good for cover at the drop ceiling areas, will need to install ceiling tile and escutcheons and verify existing system is current with an annual inspection tag prior to final.
BLD04-02348 FIRE-Final Inspection4/27/20064/28/20064/28/2006 12:31:02 PMAPASS
Correction notice items have been completed as required, fire life safety is satisfactory, the two doors at the stairway exit discharge ground level shall be verified to meet opening force requirements per IFC 2003 at structural final inspection.
FIR05-00449 INSP-Final Inspection4/28/20064/28/20064/28/2006 12:26:38 PMPPASS
Added devices at the top of elevator hoistway tested, updated map verified, covers at SD removed, alarm passed final field inspection, permit finaled.
FIR05-00594 INSP-Final Inspection4/28/20064/28/20064/28/2006 12:23:37 PMPPASS
Fire sprinkler passed final inspection, permit finaled.
FIR06-00112 INSP-Final Inspection4/27/20064/28/20064/28/2006 9:43:54 AMAFAIL
Tested notification and detection devices at the 10th and 11th floor machine rooms, helipad, elevator lobbies, mech. penthouse, tested manual pulls, smoke at nac panel, tested sprinkler tampers and flows at the 10th floor manifold. The notification devices at the north mech. penthouse 3rd floor failed to function properly, need to test sprinkler tampers and flows at the 4th floor and tamper at the 3rd floor at next inspection.