FIR07-00166
| INSP-Final Inspection | 4/28/2008 | 4/28/2008 | 4/29/2008 5:26:48 PM | P | PASS |
|
|
Fire alarm permit work scope is approved for final-some locations eclipsed by subsequent tenant fire alarm modifications inspected under respective permits for the 5th and 4th floors.
|
FIR07-00137
| INSP-Final Inspection | 4/28/2008 | 4/28/2008 | 4/28/2008 3:48:39 PM | P | PASS |
|
|
Fire alarm modifications passed final inspection per site visit completed 5/3/07, permit finaled.
|
FIR08-00180
| INSP-Sprinkler Rough-in/Hydro | 4/25/2008 | 4/28/2008 | 4/28/2008 3:43:33 PM | P | FAIL |
|
|
Hydrostatic testing for the new 10" supply line failed due to pressure loss at the guage and visible leakage at OS&Y isolation valves, also noted system static is approx. 165 psi which will necessitate testing in excess of 200 psi to meet NFPA requirements.
|
FIR06-00621
| INSP-Alarm Testing | 4/23/2008 | 4/28/2008 | 4/28/2008 3:39:27 PM | A | PART |
|
|
Completed preliminary walkthrough of cleanroom areas prior to fire alarm notification test to verify positioning, cd settings and spacing of horn/strobe appliances.
|
FIR06-00620
| INSP-Alarm Testing | 4/23/2008 | 4/28/2008 | 4/28/2008 3:38:46 PM | A | PART |
|
|
Completed preliminary walkthrough of cleanroom areas prior to fire alarm notification test to verify positioning, cd settings and spacing of horn/strobe appliances.
|
BLD07-01757
| FIRE-Final Inspection | 4/25/2008 | 4/28/2008 | 4/28/2008 11:30:11 AM | A | PASS |
|
|
Fire life safety inspection completed satisfactory, door closure at two locations including doors170-2 at the Cultural Hall and 168-1at room 168 south side are in need of adjustment- this is to be completed prior to structural final and verified at that time as discussed.
|
FIR08-00241
| INSP-Final Inspection | 4/25/2008 | 4/28/2008 | 4/28/2008 11:26:32 AM | A | PASS |
|
|
Noted correction at the previous inspection verified for completion, new fire alarm work passed field testing, permit finaled.
|
FIR07-00902
| INSP-Sprinkler Rough-in/Hydro | 4/28/2008 | 4/28/2008 | 4/28/2008 10:25:31 AM | A | PART |
|
|
See locatons on approved plans set for rough-in areas inspected and okayed to date, noted shell protection sprig-ups at the common corridor 2nd floor are not installed-heads at this area may coincide with tenant permit work depending on job schedule.
|