Inspections for the day of: Tuesday, April 28, 2009.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE07-02473 ELE-Aging Inspection4/28/20094/28/20095/1/2009 4:24:32 PM DONE
no activity, see doc expire
ELE08-02384 ELE-Aging Inspection4/28/20094/28/20095/1/2009 4:22:31 PM DONE
no activity, suc
ELE07-03457 ELE-Aging Inspection4/28/20094/28/20095/1/2009 4:21:59 PM DONE
suc
ESC08-00821 General Inspection4/28/20094/28/20094/28/2009 4:03:26 PMPPASS
looked ok
ESC09-00105 General Inspection4/28/20094/28/20094/28/2009 4:02:47 PMPPASS
looked ok, site finalled
ESC08-00490 General Inspection4/28/20094/28/20094/28/2009 4:01:38 PMPPASS
looked ok
ESC09-00153 General Inspection4/28/20094/28/20094/28/2009 4:00:53 PMPPASS
looked ok
ESC07-00872 General Inspection4/28/20094/28/20094/28/2009 4:00:18 PMPPASS
looked ok
ESC07-00876 General Inspection4/28/20094/28/20094/28/2009 3:59:37 PMPPASS
looked ok
ELE07-02422 Electrical Rough-In4/27/20094/28/20094/28/2009 3:57:12 PMPCANC
Perry--anytime after 12 please--please call prior to inspection Phone #: ###-#### see conference, no esc this project
ELE07-02422 Conference4/28/20094/28/20094/28/2009 3:56:40 PMPDONE
Perry--anytime after 12 please--please call prior to inspection Phone #: ###-#### met with owner to review make-up, stapling, sub-panel grounding, box fill, when to call for ri, no esc this project
ELE09-00619 Conference4/27/20094/28/20094/28/2009 3:28:41 PMPDONE
sam - please call 1/2 hr prior Phone #: ###-#### talked about sub-panel ,layout for garage, make-up, box fill, when to call for ri, no esc this project
ELE08-00407 Electrical Rough-In4/28/20094/28/20094/28/2009 2:16:08 PMPPASS
Joe Phone #: ###-#### ok to cover anop
ELE08-00409 Electrical Rough-In4/28/20094/28/20094/28/2009 1:38:31 PMPPART
Joe Phone #: ###-#### ok to cover anop
ELE09-00653 Permanent Service4/28/20094/28/20094/28/2009 12:51:43 PMPPASS
Dale Phone #: ###-#### p/s o/h rec ok, no esc this project
ELE08-02208 Final4/28/20094/28/20094/28/2009 12:40:48 PMPPART
tom Phone #: ###-#### ok to final floor 2&3 only
ELE09-00602 Final4/27/20094/28/20094/28/2009 10:27:18 AMAPASS
Contact person is Ric Martineau Phone #: ###-#### Internet Inspection Request from: Dave Friend ok to final, no esc this project
ELE09-00547 Final4/27/20094/28/20094/28/2009 9:55:33 AMAPASS
Scheduled by a contractor via Hello! on 4/27/2009 at 11:10:49 AM. Contact: ###-####. called contractor, ok to final
ELE08-03254 Rough-In Permanent Service4/27/20094/28/20094/28/2009 9:31:29 AMACANC
darrin Phone #: ###-#### see conference, no esc this project
ELE08-03254 Conference4/28/20094/28/20094/28/2009 9:31:04 AMADONE
darrin Phone #: ###-#### met contractor, had him check available fault current available from ipco, he will change 2 breakers, reviewed 230.6 for concrete encasemnt for service conduits, they shall be concrete encased or provide a disconnect on outside of building, no esc this project
ELE08-03176 Electrical Rough-In4/28/20094/28/20094/28/2009 8:49:55 AMAPART
Ceiling cover on suspended ceilings Phone #: ###-#### Internet Inspection Request from: Don Lustig ok to cover ceilings anop, called contractor provide installation instructions for cable hung fixtures
ELE09-00685 Permanent Service4/27/20094/28/20094/28/2009 8:08:25 AMACANC
jason Phone #: ###-#### see conference
ELE09-00685 Conference4/28/20094/28/20094/28/2009 8:08:13 AMADONE
jason Phone #: ###-#### called contractor to verify that available fault current will be less than interrupt capacity for equipment installed, 10,000 amp