ELE07-02473
| ELE-Aging Inspection | 4/28/2009 | 4/28/2009 | 5/1/2009 4:24:32 PM | | DONE |
|
|
no activity, see doc expire
|
ELE08-02384
| ELE-Aging Inspection | 4/28/2009 | 4/28/2009 | 5/1/2009 4:22:31 PM | | DONE |
|
|
no activity, suc
|
ELE07-03457
| ELE-Aging Inspection | 4/28/2009 | 4/28/2009 | 5/1/2009 4:21:59 PM | | DONE |
|
|
suc
|
ESC08-00821
| General Inspection | 4/28/2009 | 4/28/2009 | 4/28/2009 4:03:26 PM | P | PASS |
|
|
looked ok
|
ESC09-00105
| General Inspection | 4/28/2009 | 4/28/2009 | 4/28/2009 4:02:47 PM | P | PASS |
|
|
looked ok, site finalled
|
ESC08-00490
| General Inspection | 4/28/2009 | 4/28/2009 | 4/28/2009 4:01:38 PM | P | PASS |
|
|
looked ok
|
ESC09-00153
| General Inspection | 4/28/2009 | 4/28/2009 | 4/28/2009 4:00:53 PM | P | PASS |
|
|
looked ok
|
ESC07-00872
| General Inspection | 4/28/2009 | 4/28/2009 | 4/28/2009 4:00:18 PM | P | PASS |
|
|
looked ok
|
ESC07-00876
| General Inspection | 4/28/2009 | 4/28/2009 | 4/28/2009 3:59:37 PM | P | PASS |
|
|
looked ok
|
ELE07-02422
| Electrical Rough-In | 4/27/2009 | 4/28/2009 | 4/28/2009 3:57:12 PM | P | CANC |
|
|
Perry--anytime after 12 please--please call prior to inspection Phone #: ###-#### see conference, no esc this project
|
ELE07-02422
| Conference | 4/28/2009 | 4/28/2009 | 4/28/2009 3:56:40 PM | P | DONE |
|
|
Perry--anytime after 12 please--please call prior to inspection Phone #: ###-#### met with owner to review make-up, stapling, sub-panel grounding, box fill, when to call for ri, no esc this project
|
ELE09-00619
| Conference | 4/27/2009 | 4/28/2009 | 4/28/2009 3:28:41 PM | P | DONE |
|
|
sam - please call 1/2 hr prior Phone #: ###-#### talked about sub-panel ,layout for garage, make-up, box fill, when to call for ri, no esc this project
|
ELE08-00407
| Electrical Rough-In | 4/28/2009 | 4/28/2009 | 4/28/2009 2:16:08 PM | P | PASS |
|
|
Joe Phone #: ###-#### ok to cover anop
|
ELE08-00409
| Electrical Rough-In | 4/28/2009 | 4/28/2009 | 4/28/2009 1:38:31 PM | P | PART |
|
|
Joe Phone #: ###-#### ok to cover anop
|
ELE09-00653
| Permanent Service | 4/28/2009 | 4/28/2009 | 4/28/2009 12:51:43 PM | P | PASS |
|
|
Dale Phone #: ###-#### p/s o/h rec ok, no esc this project
|
ELE08-02208
| Final | 4/28/2009 | 4/28/2009 | 4/28/2009 12:40:48 PM | P | PART |
|
|
tom Phone #: ###-#### ok to final floor 2&3 only
|
ELE09-00602
| Final | 4/27/2009 | 4/28/2009 | 4/28/2009 10:27:18 AM | A | PASS |
|
|
Contact person is Ric Martineau Phone #: ###-#### Internet Inspection Request from: Dave Friend ok to final, no esc this project
|
ELE09-00547
| Final | 4/27/2009 | 4/28/2009 | 4/28/2009 9:55:33 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 4/27/2009 at 11:10:49 AM. Contact: ###-####. called contractor, ok to final
|
ELE08-03254
| Rough-In Permanent Service | 4/27/2009 | 4/28/2009 | 4/28/2009 9:31:29 AM | A | CANC |
|
|
darrin Phone #: ###-#### see conference, no esc this project
|
ELE08-03254
| Conference | 4/28/2009 | 4/28/2009 | 4/28/2009 9:31:04 AM | A | DONE |
|
|
darrin Phone #: ###-#### met contractor, had him check available fault current available from ipco, he will change 2 breakers, reviewed 230.6 for concrete encasemnt for service conduits, they shall be concrete encased or provide a disconnect on outside of building, no esc this project
|
ELE08-03176
| Electrical Rough-In | 4/28/2009 | 4/28/2009 | 4/28/2009 8:49:55 AM | A | PART |
|
|
Ceiling cover on suspended ceilings Phone #: ###-#### Internet Inspection Request from: Don Lustig ok to cover ceilings anop, called contractor provide installation instructions for cable hung fixtures
|
ELE09-00685
| Permanent Service | 4/27/2009 | 4/28/2009 | 4/28/2009 8:08:25 AM | A | CANC |
|
|
jason Phone #: ###-#### see conference
|
ELE09-00685
| Conference | 4/28/2009 | 4/28/2009 | 4/28/2009 8:08:13 AM | A | DONE |
|
|
jason Phone #: ###-#### called contractor to verify that available fault current will be less than interrupt capacity for equipment installed, 10,000 amp
|