BLD09-00518
| BLD-Aging Inspection | 4/28/2010 | 4/28/2010 | 4/28/2010 5:01:10 PM | | DONE |
|
|
Work in progress, project near completion.
|
BLD10-00782
| FIRE-Final Inspection | 4/28/2010 | 4/28/2010 | 4/28/2010 4:59:35 PM | P | PART |
|
|
Final pending field ceiling tile and posting of one PFE at an approved location. Exit signs, EM lights, suite numbers, main door hardware, etc. okayed.
|
FIR10-00189
| INSP-Sprinkler Rough-in | 4/27/2010 | 4/28/2010 | 4/28/2010 4:57:00 PM | P | PART |
|
|
Overhead system modifications are approved for cover at the drop ceilings.
|
BLD10-00765
| FIRE-Final Inspection | 4/28/2010 | 4/28/2010 | 4/28/2010 4:55:31 PM | P | PART |
|
|
Project attatched fire sprinkler permit passed, final pending one fire extinguisher to be posted as discussed.
|
FIR10-00186
| INSP-Final Inspection | 4/28/2010 | 4/28/2010 | 4/28/2010 4:53:46 PM | P | PASS |
|
|
Fire alarm testing passed, permit final okay.
|
FIR09-00540
| INSP-Final Inspection | 4/27/2010 | 4/28/2010 | 4/28/2010 4:51:36 PM | A | PEND |
|
|
jon Phone #: ###-#### ref. activity note 4/27
|
FIR10-00190
| INSP-Final Inspection | 4/27/2010 | 4/28/2010 | 4/28/2010 4:49:24 PM | A | PASS |
|
|
Rough-in and final inspections completed at the same time, inspection passed, permit final approved.
|