ESC09-00352
| General Inspection | 4/28/2011 | 4/28/2011 | 4/28/2011 3:28:22 PM | P | PASS |
|
|
Controls in place, vegetative cells along the river are working fine, water slowing down by berms at cell perameters. No major problems observed.
|
ESC10-00689
| General Inspection | 4/28/2011 | 4/28/2011 | 4/28/2011 3:09:37 PM | | PASS |
|
|
No problems observed.
|
ESC11-00163
| General Inspection | 4/28/2011 | 4/28/2011 | 4/28/2011 3:01:18 PM | P | PART |
|
|
Verbal correction-top dressing on east entrance.
|
ESC10-00600
| General Inspection | 4/28/2011 | 4/28/2011 | 4/28/2011 1:32:00 PM | | PASS |
|
|
Area around new bridge has been hydroseeded, other area remains bare but grading activities being performed to prepare the area for seeding. Area under the bridge has slope and runoff protection in place.
|
ESC10-00743
| General Inspection | 4/28/2011 | 4/28/2011 | 4/28/2011 1:07:52 PM | | PASS |
|
|
Staging Area, appears ok, no problems observed.
|
ESC10-00611
| General Inspection | 4/28/2011 | 4/28/2011 | 4/28/2011 7:52:45 AM | | DONE |
|
|
Needs 70% re-vegetation.
|