Inspections for the day of: Thursday, April 28, 2011.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00495 General Inspection4/28/20114/28/20114/28/2011 4:46:09 PM PASS
ESC10-00546 General Inspection4/28/20114/28/20114/28/2011 1:50:59 PM DONE
Permit finalled.
ESC10-00546 DOC - Permit Finaled4/28/20114/28/20114/28/2011 1:49:57 PMPPASS
ESC11-00175 Site Preparation4/21/20114/28/20114/28/2011 1:48:14 PMANR
No activity.
ESC10-00470 General Inspection4/28/20114/28/20114/28/2011 1:26:26 PM PASS
ESC10-00822 Site Preparation4/26/20114/28/20114/28/2011 10:30:49 AMANR
The project has not begun. Will re-inspect on 5/4/2011am.
ESC11-00180 BMP Violation4/27/20114/28/20114/28/2011 10:28:56 AMAFAIL
Spoke with the RP and erosion control contractor and was told that the storm drains will be installed today prior to the end of the work day. Also will have all other storm drain inlet protection cleaned and maintained by the end of day 4/29/2011. Will re-inspect on 4/29/2011 PM.
ESC11-00169 Site Preparation4/28/20114/28/20114/28/2011 10:26:38 AM PASS
ESC11-00176 BMP Violation4/27/20114/28/20114/28/2011 9:38:37 AMAPASS
ESC10-00531 BMP Violation4/27/20114/28/20114/28/2011 9:33:51 AMAPART
Verbal to RP:
When usung pocketed silt fence, the pocketed stakes must be on the inside of where you are trying to pervent sediment from going. Also clean up all hard surface of all sediment and debris off of the hard surfaces.
ESC10-00533 General Inspection4/28/20114/28/20114/28/2011 8:43:41 AM PASS