BLD15-00594
| BLD-Framing/Rough-in | 4/27/2015 | 4/28/2015 | 4/28/2015 4:01:27 PM | P | PASS |
|
|
Dan Phone #: ###-####
|
BLD14-03178
| BLD-Framing/Rough-in | 4/27/2015 | 4/28/2015 | 4/28/2015 3:42:38 PM | P | FAIL |
|
|
Plans will be above the fireplace. Phone #: ###-#### Inspection requested via web by Scott Zierler. Complete lateral bracing on A4, B1 trusses, Nailbottom chord of B3 truss per engineering, provide h2.5 at truss bearing locations, provide additional stud on eith side of LVL for fron proch or strap. Install post and footing for front porches, 2hr. firewall not continous to roof deck, laydown parapet needs to be installed to rear of unit, need to verifiy 5/8type x rock on soffits, no soffit vents allowed.
|
BLD14-03179
| BLD-Framing/Rough-in | 4/27/2015 | 4/28/2015 | 4/28/2015 3:38:03 PM | P | FAIL |
|
|
Plans will be above the fireplace Phone #: ###-#### Inspection requested via web by Scott Zierler. Complete lateral bracing on A4, B1 trusses, Nailbottom chord of B3 truss per engineering, provide h2.5 at truss bearing locations, provide additional stud on eith side of LVL for fron proch or strap. Install post and footing for front porches, 2hr. firewall not continous to roof deck, laydown parapet needs to be installed to rear of unit, need to verifiy 5/8type x rock on soffits.
|
ESC15-00161
| Site Final | 4/28/2015 | 4/28/2015 | 4/28/2015 2:10:31 PM | P | DONE |
|
|
|
ESC15-00161
| DOC - Permit Finaled | 4/28/2015 | 4/28/2015 | 4/28/2015 2:10:22 PM | P | PASS |
|
|
|
BLD15-00474
| BLD-Final | 4/28/2015 | 4/28/2015 | 4/28/2015 2:10:03 PM | P | PASS |
|
|
|
BLD15-00474
| DOC - Permit Finaled | 4/28/2015 | 4/28/2015 | 4/28/2015 2:09:52 PM | P | PASS |
|
|
|
MIS15-00038
| BLD-Conference | 4/28/2015 | 4/28/2015 | 4/28/2015 2:09:12 PM | P | PASS |
|
|
Thank you! Phone #: ###-#### Inspection requested via web by Dale Hope
|
MIS15-00038
| DOC - Permit Finaled | 4/28/2015 | 4/28/2015 | 4/28/2015 2:08:58 PM | P | PASS |
|
|
|
ESC15-00048
| General Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 1:56:12 PM | P | PASS |
|
|
|
BLD15-00175
| BLD-Framing/Rough-in | 4/28/2015 | 4/28/2015 | 4/28/2015 1:55:45 PM | P | FAIL |
|
|
Have corrected issues this a.m. Phone #: ###-#### Inspection requested via web by Paul Thompson. Provide additional engineering for 3ply LVL that has been drilled in several places. Provide lateral bracing on A1 trusses in garage. Provide header for door under stairs. Ok to insulate.
|
BLD13-03584
| BLD-Conference | 4/27/2015 | 4/28/2015 | 4/28/2015 11:20:24 AM | A | PASS |
|
|
exterior shear Phone #: ###-#### Inspection requested via web by Mel Rawlinson
|
BLD13-03598
| BLD-Conference | 4/27/2015 | 4/28/2015 | 4/28/2015 11:19:27 AM | A | NR |
|
|
exterior shear Phone #: ###-#### Inspection requested via web by Mel Rawlinson
|
BLD13-03594
| BLD-Framing/Rough-in | 4/27/2015 | 4/28/2015 | 4/28/2015 11:14:53 AM | A | NR |
|
|
rough framing Phone #: ###-#### Inspection requested via web by Mel Rawlinson. Fire sprinkler rough in inspection?
|
BLD15-01028
| BLD-Framing/Rough-in | 4/27/2015 | 4/28/2015 | 4/28/2015 10:07:29 AM | A | NH |
|
|
Darla Phone #: ###-####. No aceess into building. No inspection was completed.
|
BLD15-00251
| BLD-Final | 4/27/2015 | 4/28/2015 | 4/28/2015 10:06:00 AM | A | NR |
|
|
Seth Phone #: ###-####. PEr the ESC conditions, the site must be stabalized prior to passing the final.
|
BLD15-00175
| BLD-Framing/Rough-in | 4/27/2015 | 4/28/2015 | 4/28/2015 9:25:24 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Paul Thompson. Complete airseal prior to framing inspection. Inspection cancelled from web by: Paul Thompson
|