ESC13-01006
| General Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 4:30:51 PM | | PASS |
|
|
WIP on townhome. Needs landscaping and final site clean up. No spills or discharges observed. Approved.
|
ESC15-00024
| General Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 4:07:39 PM | P | PASS |
|
|
Site is clean. BMPs installed, permit posted. NO corrections necessary.
|
ESC14-00759
| General Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 3:56:36 PM | | PASS |
|
|
WIP. No trackout. Silt fence perimeter is installed and properly trenched in. No windblown litter, no fugitive dust. Frame & exterior shell are complete. Work ongoing on interior currently.
|
ESC14-00356
| General Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 3:51:42 PM | P | PASS |
|
|
Permit posted. Swale still has perimeter sediment protection. Site has been kept clean throughout project. Approved.
|
ESC14-00696
| General Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 3:47:32 PM | | PASS |
|
|
WIP on armory renovation & window sill installation. No trackout from site. Excavated dirt stored on grass within site to prevent runoff on hard surfaces to storm drains.
Approved.
|
ESC14-00777
| DOC - Permit Finaled | 4/28/2015 | 4/28/2015 | 4/28/2015 2:04:34 PM | P | PASS |
|
|
|
ESC14-00777
| Site Final | 4/28/2015 | 4/28/2015 | 4/28/2015 2:04:09 PM | P | PASS |
|
|
Project complete. Vertical construction and parking lot/site improvements complete. Disturbed area has been hydroseeded. ESC permit conditions satisfied, all other permits finaled.
|
ESC14-00169
| Aging Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 1:20:22 PM | | PASS |
|
|
Cloud seeding vehicle and equipment wash station is complete but addition site improvements are in progress. Disturbed area has some stockpiles contained within curbed area. No violations. Approved.
|
ESC14-00432
| General Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 12:26:43 PM | | PASS |
|
|
DI bags on Lazaro have been maintained and reinstalled as requested during last inspection. No activity at this time. Grading for parcels is complete, equipment has been removed.
All DIs in Aralar Park have inlet protection. Silt fence and vegetative buffer in good condition. WIll need to be rechecked before SFH construction by Hayden Homes.
Approved.
|
ESC15-00055
| BMP Violation | 4/27/2015 | 4/28/2015 | 4/28/2015 11:34:53 AM | A | PASS |
|
|
complaint received that there is no DI bag in the storm drain directly in front of the new SFH under construction.
Earthwork complete, WIP on frame and roof. Sidewalks and gutter are clean and swept regularly. Will waive inlet requirement as yard will soon be landscaped and no stockpiles are on site.
No corrections issued.
|
ESC13-01159
| General Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 10:47:40 AM | | PASS |
|
|
WIP on restoring deficient grassy swale. Workers keeping disturbed dirt of hard surfaces to avoid transport/runoff in stormwater or irrigation water. Individual SFHs by CBH are in progress. Trash is contained, workers staying off open dirt areas, all inlets have sediment protection. The first complete house is now sold so soon neighborhood will begin to have residents. No corrections at this time.
|
ESC14-00668
| Aging Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 10:28:43 AM | | PASS |
|
|
Addition complete, landscaping and stabilization are currently in progress. Stockpile of top soil be stored on the front yard and carried to back yard. Street is clean, crew has brooms for end of day sweep up. No corrections.
|
ESC14-00774
| Random Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 9:32:35 AM | P | PEND |
|
|
Construction on warehouse complete and BLD is finaled.
No trackout, discharges, or dust at site. ESC permit not ready for final, need to stablize/hydroseed the berms on the lot to the east that was used for staging and stockpiling. Parking lot should be swept and port-a-pot removed when work complete.
|
ESC14-00567
| General Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 9:17:05 AM | | PASS |
|
|
Construction complete on warehouse TI project. Area of disturbance outside is contained within cement curbing and pathway and has been covered with bark mulch. No loose sediment or materials on site. ESC permit finaled.
|
ESC14-00567
| DOC - Permit Finaled | 4/28/2015 | 4/28/2015 | 4/28/2015 9:15:17 AM | P | PASS |
|
|
|
ESC14-00747
| General Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 9:06:40 AM | | PASS |
|
|
Simplot Plant Science project is near completion. Green house building and stormwater swale have been completed.
There is a large stockpile on the south side of the site that will need stabilization or removal as well as stabilizing the disturbed dirt behind adjacent to the new structures.
No trackout to Phillipi or Irving. Greenbelt path connection has been swept and the strip between fence and path now has grasses and weeds hold sediment in place.
No corrections.
|
ESC14-00603
| Aging Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 8:27:13 AM | | PASS |
|
|
|