Inspections for the day of: Tuesday, April 28, 2015.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01006 General Inspection4/28/20154/28/20154/28/2015 4:30:51 PM PASS
WIP on townhome. Needs landscaping and final site clean up. No spills or discharges observed. Approved.
ESC15-00024 General Inspection4/28/20154/28/20154/28/2015 4:07:39 PMPPASS
Site is clean. BMPs installed, permit posted. NO corrections necessary.
ESC14-00759 General Inspection4/28/20154/28/20154/28/2015 3:56:36 PM PASS
WIP. No trackout. Silt fence perimeter is installed and properly trenched in. No windblown litter, no fugitive dust. Frame & exterior shell are complete. Work ongoing on interior currently.
ESC14-00356 General Inspection4/28/20154/28/20154/28/2015 3:51:42 PMPPASS
Permit posted. Swale still has perimeter sediment protection. Site has been kept clean throughout project. Approved.
ESC14-00696 General Inspection4/28/20154/28/20154/28/2015 3:47:32 PM PASS
WIP on armory renovation & window sill installation. No trackout from site. Excavated dirt stored on grass within site to prevent runoff on hard surfaces to storm drains.

Approved.
ESC14-00777 DOC - Permit Finaled4/28/20154/28/20154/28/2015 2:04:34 PMPPASS
ESC14-00777 Site Final4/28/20154/28/20154/28/2015 2:04:09 PMPPASS
Project complete. Vertical construction and parking lot/site improvements complete. Disturbed area has been hydroseeded. ESC permit conditions satisfied, all other permits finaled.
ESC14-00169 Aging Inspection4/28/20154/28/20154/28/2015 1:20:22 PM PASS
Cloud seeding vehicle and equipment wash station is complete but addition site improvements are in progress. Disturbed area has some stockpiles contained within curbed area. No violations. Approved.
ESC14-00432 General Inspection4/28/20154/28/20154/28/2015 12:26:43 PM PASS
DI bags on Lazaro have been maintained and reinstalled as requested during last inspection. No activity at this time. Grading for parcels is complete, equipment has been removed.

All DIs in Aralar Park have inlet protection. Silt fence and vegetative buffer in good condition. WIll need to be rechecked before SFH construction by Hayden Homes.

Approved.
ESC15-00055 BMP Violation4/27/20154/28/20154/28/2015 11:34:53 AMAPASS
complaint received that there is no DI bag in the storm drain directly in front of the new SFH under construction.

Earthwork complete, WIP on frame and roof. Sidewalks and gutter are clean and swept regularly. Will waive inlet requirement as yard will soon be landscaped and no stockpiles are on site.

No corrections issued.
ESC13-01159 General Inspection4/28/20154/28/20154/28/2015 10:47:40 AM PASS
WIP on restoring deficient grassy swale. Workers keeping disturbed dirt of hard surfaces to avoid transport/runoff in stormwater or irrigation water. Individual SFHs by CBH are in progress. Trash is contained, workers staying off open dirt areas, all inlets have sediment protection. The first complete house is now sold so soon neighborhood will begin to have residents. No corrections at this time.
ESC14-00668 Aging Inspection4/28/20154/28/20154/28/2015 10:28:43 AM PASS
Addition complete, landscaping and stabilization are currently in progress. Stockpile of top soil be stored on the front yard and carried to back yard. Street is clean, crew has brooms for end of day sweep up. No corrections.
ESC14-00774 Random Inspection4/28/20154/28/20154/28/2015 9:32:35 AMPPEND
Construction on warehouse complete and BLD is finaled.

No trackout, discharges, or dust at site. ESC permit not ready for final, need to stablize/hydroseed the berms on the lot to the east that was used for staging and stockpiling. Parking lot should be swept and port-a-pot removed when work complete.
ESC14-00567 General Inspection4/28/20154/28/20154/28/2015 9:17:05 AM PASS
Construction complete on warehouse TI project. Area of disturbance outside is contained within cement curbing and pathway and has been covered with bark mulch. No loose sediment or materials on site. ESC permit finaled.
ESC14-00567 DOC - Permit Finaled4/28/20154/28/20154/28/2015 9:15:17 AMPPASS
ESC14-00747 General Inspection4/28/20154/28/20154/28/2015 9:06:40 AM PASS
Simplot Plant Science project is near completion. Green house building and stormwater swale have been completed.

There is a large stockpile on the south side of the site that will need stabilization or removal as well as stabilizing the disturbed dirt behind adjacent to the new structures.

No trackout to Phillipi or Irving. Greenbelt path connection has been swept and the strip between fence and path now has grasses and weeds hold sediment in place.

No corrections.
ESC14-00603 Aging Inspection4/28/20154/28/20154/28/2015 8:27:13 AM PASS