BLD15-03857
| BLD-Aging Inspection | 4/28/2016 | 4/28/2016 | 5/5/2016 7:39:49 AM | | PEND |
|
|
|
BLD15-04401
| BLD-Aging Inspection | 4/28/2016 | 4/28/2016 | 5/5/2016 7:34:03 AM | | PEND |
|
|
|
BLD15-03489
| BLD-Concrete | 4/28/2016 | 4/28/2016 | 5/5/2016 7:32:55 AM | P | PART |
|
|
PT suspended concrete slab level 2 pour 2. Concrete scheduled for 2 am 4/29. Elevator core wall reinforcement. 100''- 116'' elevation. MTI has been on site and conducted inspected. SS is scheduled to be on site for pours. Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD14-03207
| BLD-Conference | 4/28/2016 | 4/28/2016 | 5/3/2016 6:31:43 AM | P | PART |
|
|
stair 1 levels 2and 3 ok to cover
|
BLD15-02470
| BLD-Other | 4/28/2016 | 4/28/2016 | 4/29/2016 8:49:10 AM | P | DONE |
|
|
Hand rail // Kevin Phone #: ###-####
|
BLD14-02889
| BLD-Energy code compliance | 4/28/2016 | 4/28/2016 | 4/29/2016 6:29:54 AM | P | PASS |
|
|
Energy code compliance area 2 on level 4. Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD16-00574
| BLD-Footing | 4/27/2016 | 4/28/2016 | 4/28/2016 1:50:28 PM | P | NR |
|
|
Annie Phone #: ###-#### needs geo tech on soils
|
BLD15-04191
| BLD-Ceiling Grid Inspection | 4/28/2016 | 4/28/2016 | 4/28/2016 1:48:03 PM | P | NR |
|
|
Darin Phone #: ###-####
|
BLD15-04244
| BLD-Final | 4/27/2016 | 4/28/2016 | 4/28/2016 11:15:53 AM | A | PASS |
|
|
Please call Bill for lockbox code Phone #: ###-#### Inspection requested via web by Bill Garrett
|
BLD15-04244
| DOC - Permit Finaled | 4/28/2016 | 4/28/2016 | 4/28/2016 11:15:35 AM | P | PASS |
|
|
|
BLD16-01009
| BLD-Footing | 4/27/2016 | 4/28/2016 | 4/28/2016 11:02:57 AM | A | PASS |
|
|
|
MIS16-00136
| BLD-Conference | 4/27/2016 | 4/28/2016 | 4/28/2016 9:47:54 AM | A | PASS |
|
|
possible wall constructed without permit: Josh Wilson Phone #: ###-#### no work being done that needs permiting owner of property has a 6ft temp screen around a storage area in parking area
|
BLD16-01082
| BLD-Footing | 4/27/2016 | 4/28/2016 | 4/28/2016 9:12:24 AM | A | PASS |
|
|
Jim Phone #: ###-####
|
BLD16-00765
| BLD-Wall Bracing | 4/25/2016 | 4/28/2016 | 4/28/2016 8:56:04 AM | A | PASS |
|
|
Second story wall - Anthony Phone #: ###-#### both first and second storey ok to cover ext
|
BLD16-01366
| BLD-Final | 4/27/2016 | 4/28/2016 | 4/28/2016 12:00:00 AM | P | PASS |
|
|
Pass ok by Dave Nadine Phone #: ###-####
|