Inspections for the day of: Thursday, April 28, 2016.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00809 General Inspection4/28/20164/28/20164/29/2016 4:10:58 PM PART
Site complete and stabilized.

Correction request -

- remove DI bag in storm drain install for sediment control

No other issues
ESC15-01182 Aging Inspection4/28/20164/28/20164/29/2016 12:36:27 PM PASS
Project complete, all permits finaled. ESC permit conditions satisfied.
ESC15-01078 Aging Inspection4/28/20164/28/20164/29/2016 7:58:28 AM CANC
rescheduled for site final
ESC16-00548 Site Preparation4/28/20164/28/20164/28/2016 2:29:31 PMPPASS
Permit posted. Work in progress. Will check next monday for sweep up. No violations or non-stormwater discharges observed.
ESC16-00507 Site Preparation4/28/20164/28/20164/28/2016 2:19:46 PMPPART
Hillside home already demolished. No site preparation inspection requested, work already complete.

Permit sign posted, no trackout or loose materials leaving site. Vegetation at bottom of yard/slope has been preserved to contain sediment.

No corrrections, additional BMPs shall be required for new home construction.
ESC16-00235 Site Preparation4/27/20164/28/20164/28/2016 1:52:42 PMPPASS
Joey Phone #: ###-####


Permit signs posted, lined concrete washout is ready for next block of townhomes. DI bags installed in alleys and on Parkcenter Blvd. Active projects are in compliance. Approved.
ESC16-00236 Site Preparation4/27/20164/28/20164/28/2016 1:52:29 PMPPASS
Joey Phone #: ###-####


Permit signs posted, lined concrete washout is ready for next block of townhomes. DI bags installed in alleys and on Parkcenter Blvd. Active projects are in compliance. Approved.
ESC16-00237 Site Preparation4/27/20164/28/20164/28/2016 1:52:17 PMPPASS
Joey Phone #: ###-####


Permit signs posted, lined concrete washout is ready for next block of townhomes. DI bags installed in alleys and on Parkcenter Blvd. Active projects are in compliance. Approved.
ESC16-00238 Site Preparation4/27/20164/28/20164/28/2016 1:52:02 PMPPASS
Joey Phone #: ###-####

Permit signs posted, lined concrete washout is ready for next block of townhomes. DI bags installed in alleys and on Parkcenter Blvd. Active projects are in compliance. Approved.
ESC15-00556 General Inspection4/28/20164/28/20164/28/2016 12:17:25 PM PASS
No subdivsion construction activity. Active SFH construction in previously built East Vally phases. No fugitive dust issues observed or reported. No corrections at this time.
ESC16-00191 Site Preparation4/27/20164/28/20164/28/2016 11:44:19 AMAPASS
Jordan Phone #: ###-####

BMPs installed and permit sign posted. RP is onsite supervising. Active earthwork occuring today, requested that sweeping of sidewalk and gutter occur today.

Approved.
ESC15-01483 General Inspection4/28/20164/28/20164/28/2016 11:19:24 AMPPASS
Vertical construction in progress. Site perimeter sidewalk and gutter has been preserved to retain stormwater on site. Construction fence installed captures materials wrappings. Permit located on job trailer. Construction entrance installed, DIs have sediment bags. Approved.
ESC16-00557 Site Preparation4/27/20164/28/20164/28/2016 10:48:02 AMAPASS
Scott-please call prior to meet Phone #: ###-####

Patio renovation and preparation for coverered roof system. Stucco work on exterior.

Silt fence sediment control installed between project area and Logger's Creek. Vegetative buffer has been preserved on the other side of silt fence. Permit sign posted front door.

Reviewed ESC permit conditions with project supervisor. Will provide lined concrete washout. Trash container onsite, requested windblown litter control on creek bank and using water for dust suppresion when concrete cutting.

Approved
ESC15-01209 Aging Inspection4/28/20164/28/20164/28/2016 9:40:21 AM PASS
Home complete, all permits finaled. RH#6 homes still in progress with open permits. Temp BMPs to remain installed.
ESC15-01209 DOC - Permit Finaled4/28/20164/28/20164/28/2016 9:39:29 AMPPASS
ESC15-00789 General Inspection4/28/20164/28/20164/28/2016 8:58:21 AM PASS
Construction entrance and MS4 DI protection is installed and in good condtion. RP has been responsive to corrections and regular sweeping & housekeeping has occured. Vertical construction in progress.
ESC15-00586 General Inspection4/28/20164/28/20164/28/2016 8:57:19 AM CANC
no construction or activity has started at site