BLD17-00217
| FIRE-Final Inspection | 4/28/2017 | 4/28/2017 | 4/28/2017 2:49:54 PM | P | PASS |
|
|
life safety passed
|
BLD17-00780
| FIRE-Final Inspection | 4/28/2017 | 4/28/2017 | 4/28/2017 1:36:29 PM | P | PASS |
|
|
Life safety passed
|
FIR17-00194
| INSP-Final Inspection | 4/27/2017 | 4/28/2017 | 4/28/2017 1:35:52 PM | P | PASS |
|
|
Permit finaled
|
FIR17-00080
| INSP-Sprinkler Rough-in | 4/27/2017 | 4/28/2017 | 4/28/2017 12:36:55 PM | A | PASS |
|
|
Rough-in inspection passed for piping from the south end to the CMU wall as marked on the plans. Piping can be covered except around the sky lights. Mark is going to follow up on the need for sidewalls in the two sky lights.
|
BLD16-02699
| FIRE-Final Inspection | 4/27/2017 | 4/28/2017 | 4/28/2017 11:25:52 AM | A | PASS |
|
|
life safety passed
|
BLD16-01092
| FIRE-Final Inspection | 4/27/2017 | 4/28/2017 | 4/28/2017 10:21:06 AM | A | PASS |
|
|
Life safety passed
|
FIR17-00109
| INSP-Final Inspection | 4/27/2017 | 4/28/2017 | 4/28/2017 10:20:21 AM | A | PASS |
|
|
Permit finaled
|
FIR16-00806
| INSP-Sprinkler Rough-in | 4/27/2017 | 4/28/2017 | 4/28/2017 9:44:38 AM | A | PART |
|
|
Rough-in passed for the most part. However I need verification on whether one or two screws are required for the side beam brackets, seismic calculations need to be resubmitted for the actual location of the bracing or install bracing as per plan, it appears that branchline restraints are required for nearly every branchline. Piping can be covered.
|
FIR16-00477
| INSP-Final Inspection | 4/28/2017 | 4/28/2017 | 4/28/2017 8:35:32 AM | P | PASS |
|
|
Permit finaled
|
FIR17-00153
| INSP-Sprinkler Rough-in | 4/27/2017 | 4/28/2017 | 4/28/2017 8:03:41 AM | A | CANC |
|
|
To be canceled per Mike Martin
Phone #: ###-#### Inspection requested via web by Kay Haney
|
FIR16-00454
| INSP-Final Inspection | 4/27/2017 | 4/28/2017 | 4/28/2017 7:25:19 AM | A | PASS |
|
|
Permit finaled
|