ELE20-01029
| Final | 4/28/2020 | 4/28/2020 | 4/28/2020 3:04:32 PM | P | PASS |
|
|
Hedi Please call***Try Video** Phone #: ###-####...ok to final
|
ELE20-00695
| Final | 4/28/2020 | 4/28/2020 | 4/28/2020 2:36:26 PM | P | FAIL |
|
|
access 1027 Phone #: ###-#### Inspection requested via web by David Nelson...
1) all receptacles shall be operational at time of inspection
2) unused electrical shall be completely removed or safed off...empty flex laying on grid
3) fixture whips and all other electrical shall be off grid and strapped to seperate tie wires other then grid wires 4) outlets within 6ft of sink shall have GFCI protection
|
ELE20-01398
| Electrical Rough-In | 4/28/2020 | 4/28/2020 | 4/28/2020 1:59:16 PM | P | FAIL |
|
|
trench ready for insp Phone #: ###-#### Inspection requested via web by Terissa Morain... corrections not met as per correction notice requiring underground/trench be completely open for reinspection further reinspects shall have reinspection fees applied if requirements not met
|
ELE19-04868
| Electrical Rough-In | 4/28/2020 | 4/28/2020 | 4/28/2020 12:53:59 PM | P | PASS |
|
|
Need a rough in for cover in the equipment room for a Therapy Swimming Pool. Pump is tempt until final.... Phone #: ###-#### Inspection requested via web by JOHN MCCURDY... cover ok handy boxes recessed at time rough inspection...verify flush or no more 1/4" at final
|
ELE19-02894
| Electrical Rough-In | 4/27/2020 | 4/28/2020 | 4/28/2020 12:31:30 PM | A | CANC |
|
|
ok with video/photo // larry Phone #: ###-####...check for email to review rough... as of 4/28/20 12:30 pm no rough inspection images received either by email or text...inspection scheduled for next day
|
ELE19-03639
| Electrical Rough-In | 4/27/2020 | 4/28/2020 | 4/28/2020 10:51:42 AM | A | PASS |
|
|
breezeway and landing ceilings (excluding heat tape locations) Phone #: ###-#### Inspection requested via web by Todd Hall... all floors breezeways ok to cover minus heat tape areas and junction box
|
ELE19-03758
| Electrical Rough-In | 4/27/2020 | 4/28/2020 | 4/28/2020 10:49:07 AM | A | PASS |
|
|
breezeway and landing ceilings (except heat tape locations) Phone #: ###-#### Inspection requested via web by Todd Hall... all floor breezeways ok to cover minus heat tape area and junction box
|
ELE18-04328
| Permanent Service | 4/27/2020 | 4/28/2020 | 4/28/2020 9:40:24 AM | A | PASS |
|
|
*screened* Mike Phone #: ###-####.. p/s o/h ok to connect
|
ELE20-01441
| Electrical Rough-In | 4/27/2020 | 4/28/2020 | 4/28/2020 9:14:28 AM | A | PASS |
|
|
On site, please enter through the back door. Phone #: ###-#### Inspection requested via web by Garrett Collins...ok to cover opened wall...outlets added on perimeter walls...1 wall opened and 2 walls fished in work
|
ELE20-00448
| Final | 4/27/2020 | 4/28/2020 | 4/28/2020 8:46:03 AM | A | FAIL |
|
|
access: 2020 Phone #: ###-#### Inspection requested via web by David Nelson... 1) panel shall be labelled to its clear, evident, and specific purpose of ea circuit...406
|
ELE20-00392
| Final | 4/27/2020 | 4/28/2020 | 4/27/2020 12:17:23 PM | A | CANC |
|
|
Matt is on another project now, but available by phone. ###-#### Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
|