PLM4045511
| INSP - Final | 4/26/1996 | 4/29/1996 | 4/29/1996 12:00:00 AM | A | PASS |
|
|
04/26/96 347 - REINSPECTION w/c 2 basin 2 tub 1 shr 1 sink 1 w/b 1 w/h 1 final o/k 4/29/6 347
|
PLM95-00015
| INSP - Plumbing Rough-in | 4/26/1996 | 4/29/1996 | 4/29/1996 12:00:00 AM | A | PASS |
|
|
04/26/96 347 - w/c 2 basin 2 sink 1 tub 1 w/b 1 r/i o/k 4/29/6 347
|
PLM95-00859
| INSP - Plumbing Rough-in | 4/29/1996 | 4/29/1996 | 4/29/1996 12:00:00 AM | P | PASS |
|
|
04/29/96 347 - BLDG J r/i o/k 4/29/6 347 w/c 24 basin 32 tub 24 sink 12
|
PLM96-00291
| INSP - Plumbing Rough-in | 4/29/1996 | 4/29/1996 | 4/29/1996 12:00:00 AM | P | PASS |
|
|
04/29/96 347 - r/i o/k corrections made 4/29/6 347 w/c 2 basin 2 tub 1 shr 1 sink 1 w/b 1 w/h 1
|
PLM96-01065
| INSP - Sprinkler & Backflow | 4/29/1996 | 4/29/1996 | 4/29/1996 12:00:00 AM | P | PASS |
|
|
04/29/96 347 - sp. o/k 4/29/6 347
|