BLD02-00323
| BLD-Framing/Rough-in | 4/26/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | A | PASS |
|
|
sheer wall tim ###-#### nailling ok for exterior cover. 4/29/2002 10:52:16 AM
|
BLD01-02154
| BLD-Framing/Rough-in | 4/26/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | A | FAIL |
|
|
###-#### MIKE truss engineering not complet for bracing/hanger nailling / top chord bracing/scabs at dtag truss with naill patren. 4/29/2002 10:33:19 AM
|
BLD01-03112
| BLD-Framing/Rough-in | 4/26/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | A | PASS |
|
|
PETE ###-#### framing ok for cover engineering fix done and in the archive. 4/29/2002 9:40:17 AM
|
BLD02-00564
| BLD-Framing/Rough-in | 4/26/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | A | PASS |
|
|
###-#### travis c/n made ok for sidding cover. 4/29/2002 8:28:00 AM
|
BLD02-00563
| BLD-Framing/Rough-in | 4/26/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | A | PASS |
|
|
###-#### traviss sidding ok for cover c/n made ok 4/29/2002 8:28:39 AM
|
BLD02-00799
| BLD-Framing/Rough-in | 4/28/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 04/28/2002 at 21:14:21. Contact: ###-####. sub-structure ok for decking. 4/29/2002 8:48:26 AM
|
BLD01-01272
| BLD-Final | 4/29/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 04/29/2002 at 00:07:16. Contact: ###-####. final ok need bond for off street parking for 500.00/ ok to isue l/c. 4/29/2002 9:04:23 AM
|
BLD02-00776
| BLD-Framing/Rough-in | 4/29/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | P | PASS |
|
|
###-#### ann marie basement per approved plan ok for cover. 4/29/2002 3:28:51 PM
|
BLD02-00724
| BLD-Footing | 4/29/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | P | PASS |
|
|
ft insp- bob- ###-#### ft and rebar ok 4/29/2002 2:55:10 PM
|
MEC02-00661
| Final | 4/29/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 04/29/2002 at 09:28:24. Contact: ###-####. Scheduled by a wrong insp type added r/i no gas piping.contractor via Hello! on 04/29/2002 at 09:28:24. Contact: ###-####. 4/29/2002 4:33:53 PM
|
BLD01-03256
| BLD-Framing/Rough-in | 4/29/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | P | PART |
|
|
###-#### JIM conf only 4/29/2002 4:34:13 PM
|
BLD01-00967
| BLD-Framing/Rough-in | 4/29/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | P | PASS |
|
|
###-#### TIM c/n made ok 4/29/2002 2:39:59 PM
|
BLD01-01681
| BLD-Final | 4/29/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | P | PASS |
|
|
###-#### final ok card on file down town. 4/29/2002 2:22:59 PM
|
MEC02-00661
| Rough-in | 4/29/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | P | PART |
|
|
vent fans ducts and return air ok no gas piping.
|
BLD02-00530
| BLD-Framing/Rough-in | 4/26/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | P | PASS |
|
|
###-#### TRAVIS SHEER NAIL c/n made ok sidding ok 4/29/2002 8:29:25 AM
|
BLD02-00306
| BLD-Framing/Rough-in | 4/26/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | P | PASS |
|
|
###-#### TRAVIS SHEER NAIL c/n made ok okto side 4/29/2002 8:29:40 AM
|
BLD02-00562
| BLD-Framing/Rough-in | 4/26/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | P | PASS |
|
|
###-#### TRAVIS SHEER NAIL c/n made ok ok to side 4/29/2002 8:29:52 AM
|
BLD02-00561
| BLD-Framing/Rough-in | 4/26/2002 | 4/29/2002 | 4/29/2002 12:00:00 AM | P | PASS |
|
|
###-#### TRAVIS SHEER NAIL c/n made ok ok to side 4/29/2002 8:30:20 AM
|